DET Craiova Operational Headquarters
Sediu operațional DET Craiova — original title
Your path to submission
- Deadline: 7 December at 15:00 — 42 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Romanian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
By building a new headquarters dedicated to the dispatching activity of S.E.N., an improvement will be achieved in terms of operating parameters for D.E.T. Craiova and, implicitly, for the Company's needs in relation to the new location where this activity will be carried out in the future, thus creating the premises for a possible further development according to the needs that are required. Through the structure of the new building, the ergonomics, reliability and security requirements applicable to the technological spaces related to the dispatching activity will be ensured, so as to ensure maximum efficiency in carrying out the specific activities of the Company. As the building will be built "from scratch", there will be the advantage of taking over in the design+execution project all the details regarding the specific security requirements (physical and IT) required in the European…
Show full description
… directives and in the national legislation. As a consequence of the previous point, all IT and communication infrastructure will be aligned with new technologies and will be secured at both physical and information infrastructure level. The purpose of the investment is to build a D+P+2E building and its associated facilities, ready for dispatching. Any request for clarifications must be submitted in SEAP (http://sicap-prod.e-licitatie.ro/pub). Number of days until which clarifications can be requested before the deadline for submission of tenders: 20 days The contracting entity will respond clearly and completely to all requests for clarification/additional information in two stages, as follows: - on the 17th calendar day after the publication of the contract notice and - on the 11th clalendaristic day before the deadline for submission of tenders. The contracting entity will respond only to requests for clarifications sent by economic operators by the deadline set, in accordance with Article 29(3) of Government Decision No 394/2016. The contracting entity reserves the right to waive in part or in full the amounts representing the estimate relating to ‘Implementation of SCADA Dispecer’, item 4.2.6 of the General Estimate and form F3 – List of quantities of works ‘Implementation of SCDADA Dispecer’, without any additional penalty or financial claim from the contractor. It will be settled strictly according to actual needs arising in execution.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (36 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to TPS INVEST.n = 36
- The median procedure drew 3 bids (217 procedures with a bid count); 24% ended with a single bidder. Sector: median 5 bids.n = 217
- 53% of this buyer's awards went to companies that had already won here before (654 awards since 2018, spread over 245 companies). 47% went to new names.n = 654 awards since 2018
- The award came in at a median 94% of the estimated value (14 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 14
- 82% of the bids received came from small and medium-sized enterprises (151 procedures with a bid mix). Sector: 65%.n = 151
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
What you must prove — eligibility criteria
Prin experiență similară se înțelege îndeplinirea de activități de complexitate comparabilă cu cele ale contractului ce urmează a fi atribuit, respectiv: a) executia de lucrari de constructii – montaj pentru realizarea unei constructii avand categoria A de imp… read in fullcollapse
Atestate pentru lucrările/serviciile pe care urmează a le executa/presta, valabile la data limita de depunere a ofertelor, după cum urmează: -Atestat A.N.R.E. de tip C1A- în conform. cu ordinul ANRE nr.134/2021 -Atestat A.N.R.E. de tip C2A – în conform. cu ord… read in fullcollapse
Subcontractarea Ofertantul va mentiona pentru fiecare subcontractant partea din contract pe care acesta are intentia sa o subcontracteze (daca este cazul) - se vor indica activitatile subcontractate cat si procentul subcontractat; Subcontractarea se va face in… read in fullcollapse
Implementarea sistemului de management al calității conform standardului de management al calității SR EN ISO 9001 sau echivalent. În cazul depunerii unei oferte comune, fiecare asociat trebuie să dețină un astfel de certificat, pentru partea din contract pe c… read in fullcollapse
Implementarea sistemului de management de mediu conform standardului de management de mediu SR EN ISO 14001 sau echivalent In cazul depunerii unei oferte comune, fiecare asociat trebuie sa dețină un astfel de certificat, pentru partea din contract pe care o re… read in fullcollapse
Operatorii economici care depun ofertă trebuie să dovedească o formă de înregistrare în condițiile legii din țara rezidentă, din care să reiasă că operatorul economic este legal constituit, că nu se află în niciuna din situațiile de anulare a constituirii, pre… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| METRO CASH & CARRY ROMANIA | 28 | 2024 |
| SOCOMAT TRADE S.R.L. | 20 | 2024–2026 |
| TRAVEL TIME D&R S.R.L. | 18 | 2022–2024 |
| TEHNO INDUSTRIAL | 16 | 2024–2026 |
| ARABESQUE | 14 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 35 completed awards — not a statement about this procedure.)
This procedure allows 43 days between publication and deadline — typical in this country is 33 (median of 2,581 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Romania · Construction work, 167 contracts went to foreign companies over the last 3 years (of 83,247 recorded awards) — mostly from France, Italy, Germany.
Submission language: Romanian.