Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Project 22.420/1 - Tielt-Winge, Connecting sewer Kiezegem

Project 22.420/1 - Tielt-Winge, Verbindingsriolering Kiezegem — original title

BEBelgium · Aartselaar

Your path to submission

  1. Deadline: 27 November at 09:30 — 26 days left.
  2. You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
  3. Offer and evidence in: Dutch.
  4. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Project 22.420/1 - Tielt-Winge, Connection sewerage Kiezegem. - Archaeological research (phase 0) - Sewerage di 250 t.e.m. di 1200, depth class up to 3 < H <= 4 m. Total 4596 lm - Prefabricated tube in reinforced concrete 2500 x 2000, depth class up to 2 < H <= 3m. Total 7 lm - Press pipes - (Re)profiling watercourses. Total 495 lm - Realization of buffer basin + winter beds - 23 structures in reinforced concrete, including 1 pumping station and 9 head walls - Mining and pressure sewerage - Water management through construction of temporary (press) pipes - House connections - Street coal connections - Reconstruction of roads - Construction of new roads - Greenery and green management

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published22 Oct 2026
ProcedureOpen procedure
Place of performanceTielt-Winge

Type of service

45 · Construction work
CPV 45232411

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (79 awards, most recently September 2026) — the next award is due around January 2027 by that rhythm. The last award went to TREVI NV.n = 79
  • The award came in at a median 58% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 21
  • 19% of this buyer's awards went to companies that had already won here before (523 awards since 2015, spread over 274 companies). 81% went to new names.n = 523 awards since 2015
  • The median procedure drew 4 bids (436 procedures with a bid count); 9% ended with a single bidder. Sector: median 4 bids.n = 436
  • 14% of awards went to companies from abroad (523 awards with a known winner country). Sector average: 11%.n = 523

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
DCA INFRA92024–2026
Colas Noord82024–2026
Besix Infra72024–2026
Antea Belgium NV52015–2025
ROEFS NV42022–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2022
71
2024
70
2025
89
2026
232 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 27 November at 09:30

Tactics

When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 76 completed awards — not a statement about this procedure.)

This procedure allows 36 days between publication and deadline — typical in this country is 34 (median of 3,233 procedures). A normal window for this market.

Foreign bidders

In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Netherlands.

Submission language: Dutch.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
Bids are submitted on BDA / e-Procurement Belgium — TED carries the same notice, usually with the more detailed specification. Read both.
TEDNoticeBDA / e-Procurement BelgiumSubmission portal
Put together the evidence — in Dutch
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now