How to bid in this country: portals, deadlines, thresholds →
Rehabilitation/consolidation of construction C1-U2 registered in cf. no. 447674-C1-U2 Timisoara (arrangement and rehabilitation of facades; interior recompartmentalization; restoration of electrical, sanitary, thermal installations; replacement of interior and exterior carpentry, restoration and replacement of interior floors; roof restoration); fencing rehabilitation
Reabilitare/ consolidare constructie C1-U2 inscrisa in cf. nr. 447674-C1-U2 Timisoara (amenajare si reabilitare fatade; recompartimentari interioare; refacere instalatii electrice, sanitare, termice; inlocuire tamplarie interioara si exterioara, refacere si inlocuire pardoseli interioare; refacere acoperis); reabilitare imprejmuire — original title
Your path to submission
- Deadline: 6 November at 15:00 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Romanian.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The object of the contract is the execution of construction works, installations and fitting-outs related to the investment objective of the project "Rehabilitation/consolidation of construction C1-U2 registered in cf. no. 447674-C1-U2 Timisoara (fitting-out and rehabilitation of facades; interior repartitions; restoration of electrical, sanitary, thermal installations; replacement of interior and exterior carpentry, restoration and replacement of interior floors; restoration of the roof); Rehabilitation fencing The works will be executed in accordance with: • Technical Project (PT); • Execution Details (DE); • Specification by specialty; • Attribution documentation; • reviews of the works contract The contract has as its sole object the execution of the works and does not include design, verification or supervision services. For the purposes of this section of the Assignment…
Show full description
… Documentation, any activity described in a specific chapter of the Specifications and not explicitly specified in another chapter must be interpreted as being mentioned in all the chapters where it is considered by the Bidder that it should be mentioned in order to ensure the fulfillment of the object of the Contract. Any annex, related to any chapter of this Task Note, is an integral part of that chapter and implicitly of the Tender Documentation. Tenderers must fully meet the minimum requirements included in this Task Note. Quantitative and qualitative partial tenders shall not be accepted, but only full tenders which comply with all the minimum requirements laid down in this Specification of Tasks and the implementation project. The tenderer shall bear all costs arising from the preparation and submission of his tender, irrespective of the result obtained when the tender was awarded. ----------- Number of days until which clarifications may be requested before the closing date for submission of tenders: 18; The contracting authority will respond clearly and completely to all requests for clarification/additional information on the 11th day before the deadline for submission of tenders. -- NOTE: The contracting authority is not obliged to respond to requests for clarifications/additional information that have not been addressed within the set deadline. · The purpose of the project is the need to urgently rehabilitate the building that is in a state of rather advanced degradation, due to the degradation of the coverings and the infiltration of water. The location is located in the city of Timisoara, on Pestalozzi Street no. 3-5, in the center-east area of the locality. The building where the investment is made is registered in C.F. no. 447674- C1-U2 Timişoara, with a built area of 2320 sqm, the property of the beneficiary "Victor Babeş" University of Medicine and Pharmacy Timişoara. On the ground floor there is also a ground floor construction C2 – ‘greasing apparatus’, with an area of 145 sqm, which does not change. The P+3E building, proposed for rehabilitation, is in an advanced stage of degradation. The building consists of three buildings that are structurally separated but communicate functionally. According to the existing data, the construction was carried out in 1974 with the function of a section/automotive workshop and administrative spaces – offices.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (44 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to SLAVONA S.R.L.n = 44
- 87% of this buyer's awards went to companies that had already won here before (2,856 awards since 2024, spread over 378 companies). That is well above the sector norm (59%) — newcomers have a harder time here than elsewhere.n = 2,856 awards since 2024
- The award came in at a median 35% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 81%.n = 6
- The median procedure drew 2 bids (121 procedures with a bid count); 47% ended with a single bidder. Sector: median 5 bids.n = 121
- 96% of the bids received came from small and medium-sized enterprises (121 procedures with a bid mix). Sector: 65%.n = 121
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Certificatului constatator emis de Oficiul National al Registrului Comertului. Operatorii economici care depun oferta trebuie sa dovedească o forma de înregistrare în condițiile legii din țara de rezidență, din care sa reiasă ca operatorul economic este legal … read in fullcollapse
În conformitate cu prevederile art.179, lit.a din Legea nr.98/2016, se solicită: Experiența similară Ofertantul trebuie să fi executat lucrări similare în ultimii 5 ani în valoare cumulată din maxim 3 contracte de cel puțin: 26.094.024,93 lei fără TVA; Prin lu… read in fullcollapse
Documente care atesta implementarea și certificarea standardelor de asigurare a calității ISO 9001/2008 sau echivalent pentru activitatea/activitățile principale ce fac obiectul contractului, valabile la data prezentării. Modalitatea de îndeplinire: Ofertanții… read in fullcollapse
Documente care atesta implementarea și certificarea standardelor de protecție a mediului ISO 14001/2015 sau echivalent pentru activitatea/activitățile principale ce fac obiectul contractului, valabile la data prezentării. Modalitatea de îndeplinire: Ofertanții… read in fullcollapse
Ofertantul are obligația de a preciza partea/ părțile din contract pe care urmează să le subcontracteze și datele de identificare ale subcontractanților propuși, dacă aceștia sunt cunoscuți la momentul depunerii ofertei. Modalitatea de îndeplinire: In DUAE com… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ALIAL SRL | 358 | 2024–2026 |
| BN BUSINESS | 275 | 2024–2026 |
| LECOM BIROTICA ARDEAL | 165 | 2024–2026 |
| DANTE INTERNATIONAL S.A. | 102 | 2024–2026 |
| TEHNODENT POKA S.R.L. | 86 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 13,790 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 33 (median of 2,802 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Romania · Construction work, 167 contracts went to foreign companies over the last 3 years (of 84,629 recorded awards) — mostly from France, Italy, Germany.
Submission language: Romanian.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now