How to bid in this country: portals, deadlines, thresholds →
Expansion of the 220/110 kV Recław station for the connection of new facilities to the PPS
Rozbudowa stacji 220/110 kV Recław dla przyłączenia nowych obiektów do KSE — original title
Your path to submission
- Deadline: 6 November at 12:00 — 5 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
1. The subject of the Order is the extension of the 220/110 kV Recław station for the connection of new facilities to the PPS, i.e. the performance of all activities, including design, formal and legal works and construction works (including the purchase and delivery of Equipment and Materials), necessary to build a field in the SE REC and the construction of the Rail Bridge together with a dedicated security building and an element not directly related to the construction of the bridge, which is a direct entry to the station area. The construction of the Rail Bridge should be carried out in accordance with the guidelines for Rail Bridges (Annex 3 to Part II of the ToR - Functional and Utility Programme (hereinafter: PFU) . It will be the Contractor's responsibility to develop complete construction documentation, executive documentation and obtain the Construction Permit, Use Permit,…
Show full description
… Works implementation, lead to fault-free acceptance and as-built documentation. 2. A detailed description of the subject-matter of the contract can be found in Part II of the ToR Functional-Use Programme. 3. As part of the Order, the Ordering Party provides for the possibility of exercising option rights. 4. Common Procurement Vocabulary names and codes: 45100000-8, 45200000-9, 45300000-0, 45400000-1, 45500000-2, 71200000-0, 71300000-1, 71400000-2, 71500000-3 5. Each time, in all cases where the Ordering Party describes the subject of the Contract by reference to standards, technical assessments, technical specifications and technical reference systems referred to in Art. 1 point 2 and par. 3 of the Act, the Ordering Party allows solutions equivalent to those described, if they allow to obtain features or parameters not inferior to those referred to. This means that the Contractor may apply the solutions described by the Contracting Authority ‘or equivalent’. 6. The Contractor who refers to solutions equivalent to those described by the Ordering Party shall be obliged to demonstrate that the supplies, services or works offered by him meet the requirements specified by the Ordering Party. The condition for the use of equivalent solutions is written approval by the Ordering Party. The differences between the standards referred to and their equivalents must be precisely described by the Contractor and submitted to the Contracting Authority during the performance of the Contract for approval. 7. The Contracting Authority informs that a local vision is mandatory for Contractors. Before submitting a tender, the Contractor must inspect the place where the works covered by the tender will be carried out and familiarise himself with the terms of performance of the contract and the difficulties encountered. Proposals for the date of visual inspection of the object should be sent to the following e-mail address: [email protected]. Deadline for carrying out the vision: the first deadline shall be 27.08.2026; the second deadline is 21.09.2026. Admission to the facility in order to carry out an on-site inspection requires the participants of the inspection to be notified by filling in Annexes 1, 2, 3 to the Instructions for granting and supervising access permits and controlling the movement of materials and vehicles at PSE S.A. power stations and handed over via the Purchasing Platform (the ‘questions/information’ tab) at the latest 5 working days before the agreed date of the inspection. Place of on-site visit: SE RECŁAW is located in the town of RECŁAW. In the case of contractors jointly applying for the contract in question, the presence of one of them is sufficient. In accordance with Art. 1 point 18) of the Act, the Ordering Party shall reject an offer that has been submitted without an on-site visit or without checking the documents necessary to perform the contract available on-site at the Ordering Party, if the Ordering Party required this in the procurement documents. · 1. The subject of the Order is the extension of the 220/110 kV Recław station for the connection of new facilities to the PPS, i.e. the performance of all activities, including design, formal and legal works and construction works (including the purchase and delivery of Equipment and Materials), necessary for the development of the field in the SE REC and the construction of the Rail Bridge with a dedicated Zab building.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (86 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to VICTOR Energy Sp. z o.o.n = 86
- 23% of this buyer's awards went to companies that had already won here before (391 awards since 2015, spread over 153 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 391 awards since 2015
- The award came in at a median 104% of the estimated value (12 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 83%.n = 12
- 53% of the bids received came from small and medium-sized enterprises (65 procedures with a bid mix). Sector: 84%.n = 65
- The median procedure drew 4 bids (331 procedures with a bid count); 11% ended with a single bidder. Sector: median 5 bids.n = 331
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… read in fullcollapse
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… read in fullcollapse
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… read in fullcollapse
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Siemens Energy Sp. z o.o. | 8 | 2023–2025 |
| Przedsiębiorstwo Badawczo-Wdrożeniowe OLMEX S.A. | 7 | 2024–2026 |
| ELFEKO S.A. | 7 | 2025–2026 |
| Electrotecnica Arteche Hermanos S.L. | 7 | 2024–2025 |
| ENPROM Sp. z o.o. | 7 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 8 or more bids came in. Many compete here — price and references decide. (Based on 84 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now