How to bid in this country: portals, deadlines, thresholds →
Referencing Market for Climate Change Planning Works (PAC) and restructuring of HTA networks - Côte d'Azur Regional Directorate
Marché de référencement Travaux Plan Aléas Climatiques (PAC) et restructuration de réseaux HTA - Direction Régionale Côte d'Azur — original title
Your path to submission
- Deadline for requests to participate: 2 November at 10:00 — 1 day left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: French.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The case concerns the establishment of a contract for the referencing of Climate Change Planning Works (PAC) and the restructuring of HTA networks in the Côte d'Azur Regional Directorate, with subsequent contracts relating to highly mechanisable works (minimum 70%), of simple technical nature and with a length of more than 1 km. The work concerns: - Civil engineering, - Electrical engineering, - Creation and removal of HTA/BT post, - Laying, taking over and removal of aerial networks, - Installation of support (all types), - Schooling, - HTA/BT post equipment, - Study (only if the initial study is resumed and at the initiative of Enedis), - Work in subsection 4 ‘Asbestos’. The following shall be excluded from this contract: - Carrying out the initial studies, - Drawing up and validating the prevention plan during the works phase, - Decision-making to carry out additional investigations…
Show full description
… proposed by the Contractor, - Decision-making to carry out screenings prior to asbestos and PAH work in the road sidings proposed by the Contractor, - Validation of Article R323-25, - Supply of the equipment referenced under SERVAL, - Validation of the certificate of conformity R323-30, - Programming of operations with the Company’s operator, - Conducting directed drilling. · Subsequent contracts for highly mechanizable works (70% minimum), of simple technicality and with a length of more than 1 km. The work concerns: - Civil engineering, - Electrical engineering, - Creation and removal of HTA/BT post, - Laying, taking over and removal of aerial networks, - Installation of support (all types), - Schooling, - HTA/BT post equipment, - Study (only if the initial study is resumed and at the initiative of Enedis), - Work in subsection 4 ‘Asbestos’. The following shall be excluded from this contract: - Carrying out the initial studies, - Drawing up and validating the prevention plan during the works phase, - Decision-making to carry out additional investigations proposed by the Contractor, - Decision-making to carry out screenings prior to asbestos and PAH work in the road sidings proposed by the Contractor, - Validation of Article R323-25, - Supply of the equipment referenced under SERVAL, - Validation of the certificate of conformity R323-30, - Programming of operations with the Company’s operator, - Conducting directed drilling. · Subsequent contracts for highly mechanizable works (70% minimum), of simple technicality and with a length of more than 1 km. The work concerns: - Civil engineering, - Electrical engineering, - Creation and removal of HTA/BT post, - Laying, taking over and removal of aerial networks, - Installation of support (all types), - Schooling, - HTA/BT post equipment, - Study (only if the initial study is resumed and at the initiative of Enedis), - Work in subsection 4 ‘Asbestos’. The following shall be excluded from this contract: - Carrying out the initial studies, - Drawing up and validating the prevention plan during the works phase, - Decision-making to carry out additional investigations proposed by the Contractor, - Decision-making to carry out screenings prior to asbestos and PAH work in the road sidings proposed by the Contractor, - Validation of Article R323-25, - Supply of the equipment referenced under SERVAL, - Validation of the certificate of conformity R323-30, - Programming of operations with the Company’s operator, - Conducting directed drilling.
Contract
Type of service
Clement What the numbers say about this buyer
- 47% of awards went to companies from abroad (133 awards with a known winner country). Sector average: 4%.n = 133
- 2% of this buyer's awards went to companies that had already won here before (133 awards since 2017, spread over 70 companies). That is well below the sector norm (26%) — this buyer switches suppliers more often than others.n = 133 awards since 2017
- The median procedure drew 4 bids (5 procedures with a bid count); 0% ended with a single bidder. Sector: median 6 bids.n = 5
- Across 22 procedures with structured selection criteria, this buyer most often required: Quality management (4 of 22), Staff qualifications (4 of 22), References: services (1 of 22), References: works (1 of 22).n = 22
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Le candidat doit fournir une déclaration sur l'honneur pour justifier qu'il n'entre dans aucun des cas mentionnés aux articles L. 2141-1 à L 2141-5 et L. 2141-7 à L. 2141-11 du CCP . Cette déclaration est à produire par les candidats individuels et par chacu… read in fullcollapse
Pour réaliser les prestations du marché, tout soumissionnaire doit être déclaré apte par Enedis sur le produit suivant : aptitude Génie Civil Électricité (GCE). L'aptitude GCE correspond à un ensemble de prestations relatives à la réalisation et/ou à la modifi… read in fullcollapse
Le candidat doit fournir une déclaration sur l'honneur pour justifier qu'il n'entre dans aucun des cas mentionnés aux articles L. 2141-1 à L 2141-5 et L. 2141-7 à L. 2141-11 du CCP . Cette déclaration est à produire par les candidats individuels et par chacu… read in fullcollapse
Pour réaliser les prestations du marché, tout soumissionnaire doit être déclaré apte par Enedis sur le produit suivant : aptitude Génie Civil Électricité (GCE). L'aptitude GCE correspond à un ensemble de prestations relatives à la réalisation et/ou à la modifi… read in fullcollapse
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| PRYSMIAN CSF | 2 | 2024–2026 |
| IMACAB SA | 2 | 2024–2026 |
| ATID CONSULTING | 1 | 2024 |
| ORMAZABAL | 1 | 2024 |
| BEUZIT RESEAUX SUD | 1 | 2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 42,545 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 32 (median of 12,485 procedures). Much tighter than usual: the first week counts.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In France · Construction work, 1,690 contracts went to foreign companies over the last 3 years (of 46,697 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: French.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now