How to bid in this country: portals, deadlines, thresholds →
BIM Planning VST Binolen (Replacement Bstg.), VA/50Hz/LST/KIB; Lph 1-4, opt. 5-7, NRW
BIM-Planung VST Binolen (Ersatz Bstg.), VA/50Hz/LST/KIB; Lph 1-4, opt. 5-7, NRW — original title
Your path to submission
- Deadline for requests to participate: 10 November at 10:00 — 9 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: German.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Project outline transport station: The following measures (according to the ZKB layout standard) are to be implemented at the Binolen transport station by this project: - Replacement of the outer platform at Gl. 2 with a useful length of 120 m and a height above the top of the rail of 76 cm. - Replacement of the intermediate platform at Gl. 3 with a useful length of 120 m and a height above the top of the rail of 76 cm. - As part of the preliminary planning, the planner in accordance with Ril 813.0201 must observe all local, operational and signalling conditions for determining the construction length, the location of the platform and the track adjustment in coordination with the infrastructure division: Train protection system, breakpoint, holding inaccuracy. Addition: The track measurement, retrassing and production of the target track position must also be examined in the preliminary…
Show full description
… planning by the planner and in coordination with the infrastructure division. - As part of the preliminary planning, a step-free development of the intermediate platform must be examined and ensured and an individual solution must be developed with the preservation of the passenger crossing. In this context, the RÜ must be adapted to the new infrastructure and brought up to date with the latest technology. This is done in coordination with the infrastructure (RÜBE calculation). The results from the RÜBE must be coordinated directly with the I.IP-W-M (Infrastructure Management) department. - The lighting installations shall be renewed on both platforms. Note FM TA: If the 50Hz distribution needs to be adjusted, counter slots, if not sufficiently available, must be created. - electricity and water connections as well as waste water disposal for cleaning work on the platforms shall be provided. - Traveller information is to be ensured on both platforms by means of a DSA+ system. - According to PLATO, a new weather shelter must be erected on each platform. - The platform equipment and the information/guidance system will be replaced according to the equipment catalogue for Category 7 stations. - As part of the preliminary planning, variants of customer-friendly construction (acceleration of construction processes) must be examined and considered in terms of costs. Addition: Subject of the construction phase planning: During planning, the continuous operation of the traveller information (RI) and the loudspeaker systems (ELA) at each platform edge in operation must be ensured. In addition, adequate weather protection (WSH) must be provided at each platform during construction phase planning. Addition: For each traffic release, customer-relevant functions (e.g. FIA, FAA, seating options, weather protection at least as much as before conversion) must be provided as a final state or provisional.
Contract
Type of service
Clement What the numbers say about this buyer
- 77% of this buyer's awards went to companies that had already won here before (1,432 awards since 2024, spread over 324 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 1,432 awards since 2024
- The median procedure drew 2 bids (1,428 procedures with a bid count); 39% ended with a single bidder. Sector: median 3 bids.n = 1,428
- Across 62 procedures with structured selection criteria, this buyer most often required: Security of supply required (60 of 62).n = 62
- 1% of awards went to companies from abroad (1,432 awards with a known winner country). Sector average: 0%.n = 1,432
- From notice to award takes a median 119 days here (549 procedures). Sector: 123 days.n = 549
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
What you must prove — eligibility criteria
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| DB Engineering & Consulting GmbH · Berlin | 156 | 2024–2026 |
| ai Consult GmbH · Bremen | 32 | 2024–2026 |
| Werner & Balci GmbH | 28 | 2024–2026 |
| INROS LACKNER SE | 27 | 2024–2026 |
| Siemens Mobility GmbH | 26 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 813 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany · Architecture & engineering, 404 contracts went to foreign companies over the last 3 years (of 111,169 recorded awards) — mostly from Austria, Switzerland, Poland.
Submission language: German.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now