How to bid in this country: portals, deadlines, thresholds →
Replaced weir fans and their control area in parking bar
Vervangen stuwventilatoren en hun sturingsgedeelte in parking Reep — original title
Your path to submission
- Deadline: 5 November at 09:00 — 4 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Offer and evidence in: Dutch.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The works to be carried out concern: work on the ventilation system in parking Reep, in particular: Both • Removal of current jet fans; • Installation of new jet fans in six places per parking layer, according to the supplied study BR26X055 and study BR26072 of Exiss, respectively the study of fire scenarios and how the installation should react for evacuation of the CO and LPG gases in the parking area. • Replacing the servo motors on the valve grilles with adjustable types; • Adapting and programming the entire RWA installation (= the two large fans on the car park side shafts and their controls, as well as the control of the air flow through the motors on the valve grilles and the new thrust fans on the three parking layers and their controls) so that it can comply with the two matrices of study BR26X055 and study BR26072 of Exiss, whereby the current PLC control unit is retained and…
Show full description
… only needs to be reprogrammed; • Expanding or modifying the web-based page of the PLC; • Equipped with the necessary wiring for the jet fans and the valve grilles with installation in accordance with the standard and the rules of good workmanship; • Rehabilitation of the necessary connections with the fire station and the CO and LPG power station; • Installation of airflow obstructions in three places per parking layer, in particular places of partitions that obstruct the airflow from ceiling to floor and consist of masonry with sand-lime brick or a wall from Metal stud with a finished fire-resistant plate. If during the one-year guarantee period: • Maintenance of all newly installed parts of the RWA installation, as described above. • Maintenance and repair of the non-replaced parts of the RWA installation. These include: o The large axial fans that provide the supply of fresh air and extract the used air in the parking lot; o The AC drives that control these axial fans; o The shafts, the grilles in the parking lot for the valve grilles and the inlet and outlet grilles of the shafts on the street side.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (17 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to 4Best.n = 17
- 9% of this buyer's awards went to companies that had already won here before (225 awards since 2015, spread over 102 companies). 91% went to new names.n = 225 awards since 2015
- The median procedure drew 3 bids (197 procedures with a bid count); 16% ended with a single bidder. Sector: median 4 bids.n = 197
- The award came in at a median 87% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 9
- 5% of awards went to companies from abroad (225 awards with a known winner country). Sector average: 11%.n = 225
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Atalian NV | 4 | 2025–2026 |
| LECOT | 3 | 2024–2026 |
| Atir België | 3 | 2025 |
| De Meulemeester bvba | 2 | 2022–2024 |
| Devlieger Filip BVBA | 2 | 2015–2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 13 completed awards — not a statement about this procedure.)
This procedure allows 31 days between publication and deadline — typical in this country is 34 (median of 3,233 procedures). A normal window for this market.
Foreign bidders
In Belgium · Construction work, 237 contracts went to foreign companies over the last 3 years (of 2,628 recorded awards) — mostly from France, Germany, Netherlands.
Submission language: Dutch.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now