KŘP ÚSK - SPJ BOŽTĚŠICE - CELKOVÁ REKONSTRUKCE
Czechia · Ústí nad Labem · how to bid here →
Your path to submission
- Deadline: 23 September at 00:00 — 11 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 85% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 182%.n = 10
- 27% of this buyer's awards went to companies that had already won here before (16 awards since 2022, spread over 9 companies). That is well below the sector norm (76%) — this buyer switches suppliers more often than others.n = 16 awards since 2022
- The median procedure drew just one bid (13 procedures with a bid count); 92% ended with a single bidder. Sector: median 5 bids.n = 13
- 19% of awards went to companies from abroad (16 awards with a known winner country). Sector average: 7%.n = 16
- The award came in at a median 94% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 85%.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Czechia · Construction work, 135 contracts went to foreign companies over the last 3 years (of 15,955 recorded awards) — mostly from Germany, Poland, France.
Typical field: median 5 (from 13,837 awards).
What the buyer is looking for
Celková rekonstrukce objektu Stálé pořádkové jednotky Ústí nad Labem včetně výukové místnosti a vrátnice v rozsahu prací a dodávek tak, jak je vymezeno výkazem výměr, projektovou dokumentací a dle podmínek povolení stavby, jenž jsou přílohou zadávací dokumentace.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| East Port Praha, s.r.o. | 2 | 2025–2026 |
| Porsche Česká republika s.r.o. | 2 | 2022–2025 |
| ŠKODA AUTO a.s. | 2 | 2022–2025 |
| TETA s.r.o. | 2 | 2024–2026 |
| TRIPLE HELIX s.r.o. | 1 | 2025 |