Resilient Westhoek. Sliding construction for Sas van Dierendonck in Nieuwpoort.
Weerbare Westhoek. Schuifconstructie voor Sas van Dierendonck te Nieuwpoort.
Belgium · Hasselt · how to bid here →
Your path to submission
- Deadline: 13 October at 00:00 — 31 days left.
- You submit on BDA / e-Procurement Belgium — not here and not by e-mail. ↗
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (59 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to nv Besix.n = 59
- 8% of this buyer's awards went to companies that had already won here before (455 awards since 2017, spread over 143 companies). 92% went to new names.n = 455 awards since 2017
- The median procedure drew 3 bids (326 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 326
- 15% of awards went to companies from abroad (455 awards with a known winner country). Sector average: 10%.n = 455
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 11/09/2026.
Foreign bidders
In Belgium · Construction work, 222 contracts went to foreign companies over the last 3 years (of 2,530 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 5 (from 26 awards).
What the buyer is looking for
Het voorwerp van de opdracht is de engineering en built van een nieuwe schuifconstructie in te bouwen in het sas van Dierendonck, beschermd erfgoed gelegen te Nieuwpoort.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Sweco Belgium BV | 6 | 2022–2025 |
| nv Anrob | 5 | 2022–2025 |
| HERBOSCH - KIERE | 4 | 2026 |
| TRACTEBEL ENGINEERING | 4 | 2022–2026 |
| nv Hye | 3 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.