A02 South Motorway, INSB Hermagor - State Border Construction Phase I, Km 378,000 - Km 380,856 - Rehabilitation of Pavements, Bridges Drainage and Water Protection Systems
A02 Süd Autobahn, INSB Hermagor - Staatsgrenze Bauphase I, Km 378,000 - Km 380,856 - Instandsetzung Fahrbahnen, Brücken Entwässerung und Gewässerschutzanlagen
Austria · Wien · how to bid here →
Your path to submission
- Deadline: 5 October at 00:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (143 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Porr Bau GmbH.n = 143
- 14% of this buyer's awards went to companies that had already won here before (1,653 awards since 2014, spread over 412 companies). That is well below the sector norm (27%) — this buyer switches suppliers more often than others.n = 1,653 awards since 2014
- 90% of the bids received came from small and medium-sized enterprises (18 procedures with a bid mix). Sector: 54%.n = 18
- The median procedure drew 4 bids (1,360 procedures with a bid count); 9% ended with a single bidder. Sector: median 3 bids.n = 1,360
- The award came in at a median 94% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 100%.n = 13
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 11/09/2026.
Foreign bidders
In Austria · Construction work, 919 contracts went to foreign companies over the last 3 years (of 6,130 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 5 (from 95 awards).
What the buyer is looking for
A02 Süd Autobahn, INSB Hermagor - Staatsgrenze Bauphase I, Km 378,000 - Km 380,856 - Instandsetzung Fahrbahnen, Brücken Entwässerung und Gewässerschutzanlagen
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PORR Bau GmbH · 8141 AT | 16 | 2022–2026 |
| Schimetta Consult Ziviltechniker GmbH | 15 | 2025–2026 |
| STRABAG AG | 10 | 2022–2026 |
| ILF Consulting Engineers Austria GmbH · RUM BEI INNSBRUCK | 9 | 2022–2026 |
| Nievelt Ingenieur GmbH | 9 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.