Review and improvement of the existing preliminary study, and consequent preparation of a new preliminary study, execution project and technical assistance for the cycle-pedestrian overpass over the IC2
Revisão e melhoria do estudo prévio existente, e consequente elaboração de novo estudo prévio, projeto de execução e assistência técnica para a passagem superior ciclo-pedonal sobre o IC2
Portugal · Freguesia de Loures · how to bid here →
Your path to submission
- Deadline: 9 October at 00:00 — 28 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POR.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 58% of this buyer's awards went to companies that had already won here before (4,848 awards since 2012, spread over 1,553 companies). That is well above the sector norm (25%) — newcomers have a harder time here than elsewhere.n = 4,848 awards since 2012
- The award came in at a median 100% of the estimated value (4,794 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 82%.n = 4,794
- The median procedure drew 4 bids (63 procedures with a bid count); 14% ended with a single bidder. Sector: median 5 bids.n = 63
- Not one of the 4,848 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 4,848
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Portugal · Architecture & engineering, 11 contracts went to foreign companies over the last 3 years (of 724 recorded awards).
Typical field: median 14 (from 3 awards).
What the buyer is looking for
Aquisição de serviços para revisão e melhoria do estudo prévio existente, e consequente elaboração de novo estudo prévio, projeto de execução e assistência técnica para a passagem superior ciclo-pedonal sobre o IC2 que liga o Parque Papa Francisco ao passadiço pedonal ribeirinho da Bobadela
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POR.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Barraqueiro Transportes SA | 42 | 2012–2026 |
| OAPM - Construção Civil, Unipessoal, Lda. | 32 | 2013–2026 |
| Algeco - Construções Pré-Fabricadas, S.A. | 29 | 2012–2024 |
| NOS - Comunicações S.A. | 26 | 2012–2026 |
| Canhoto & Matias, Soc. Construção Cívil e Obras Públicas, Lda | 25 | 2012–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.