Energy Performance Certificates
Energideklarationer
Sweden · ESKILSTUNA · how to bid here →
Your path to submission
- Deadline: 9 October at 00:00 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SWE.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (22 awards, most recently June 2026) — the next award is due around September 2026 by that rhythm. The last award went to Projectconsult Mälardalen AB.n = 22
- 0% of this buyer's awards went to companies that had already won here before (93 awards since 2018, spread over 55 companies). That is well below the sector norm (12%) — this buyer switches suppliers more often than others.n = 93 awards since 2018
- The median procedure drew 5 bids (73 procedures with a bid count); 14% ended with a single bidder.n = 73
- The award came in at a median 100% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually about right here.n = 6
- 23% of awards went to companies from abroad (93 awards with a known winner country). Sector average: 19%.n = 93
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Sweden · Architecture & engineering, 47 contracts went to foreign companies over the last 3 years (of 691 recorded awards) — mostly from Finland, Poland, Germany.
Typical field: median 10 (from 22 awards).
What the buyer is looking for
Upphandlingen avser upprättande och uppdatering av energideklarationer för byggnader inom beställarens fastighetsbestånd samt för de fastigheter som beställaren har förvaltningsansvar för. Uppdraget omfattar byggnader av varierande slag, bland annat flerbostadshus, lokaler, samhällsfastigheter och logistikfastigheter.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SWE.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Adapteo AB | 1 | 2021 |
| AFRY Infrastructure AB | 1 | 2024 |
| Anläggning & utemiljö Svealand Aktiebolag | 1 | 2024 |
| AQ3 Arkitektur AB | 1 | 2021 |
| Aremo Sanering AB | 1 | 2020 |