IZGRADNJA SUSTAVA JAVNE ODVODNJE MRKOPLJA I SUNGERA - I. FAZA I SANACIJA VODOOPSKRBNIH CJEVOVODA U ZONI IZGRADNJE SJO MRKOPALJ – I FAZA
Croatia · Rijeka · how to bid here →
Your path to submission
- Deadline: 14 September at 00:00 — 3 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HRV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 95% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 159%.n = 10
- 42% of this buyer's awards went to companies that had already won here before (25 awards since 2024, spread over 15 companies). That is well below the sector norm (68%) — this buyer switches suppliers more often than others.n = 25 awards since 2024
- The award came in at a median 67% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 93%.n = 13
- The median procedure drew just one bid (10 procedures with a bid count); 50% ended with a single bidder. Sector: median 3 bids.n = 10
- 0% of the bids received came from other countries (10 procedures with a bid mix) — all bidders, not just the winners. Sector: 11%.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Croatia · Construction work, 12 contracts went to foreign companies over the last 3 years (of 2,064 recorded awards).
Typical field: median 3 (from 2,103 awards).
What the buyer is looking for
Construction of the public drainage system of Mrkopalj and Sunger - Phase I and rehabilitation of water supply pipelines in the construction zone of SJO Mrkopalj - Phase I. The works include construction/rehabilitation: - construction of the public drainage system of the agglomeration Mrkopalj in the settlement Mrkopalj in the length of 1,794.26 m' PVC pipes DN 250, construction of two pumping stations and a part of the pressure pipelines PEHD pipes DN 90 mm with a total length of 434.81 m'. - repair of the water supply pipeline, from the material Duktil DN 100 mm, total length: V1= 448.85 m, V2.1= 64.36 m, V2.2= 166.76 m, V2.3= 151.98 m, V3= 97.42 m, V4= 52.17 m, V5= 123.88 m, V6= 233.38 m, V7= 442.00 m, V7.1. = 259.98 m, V7.2. = 44,72 m. - Water supply pipelines, of Duktil DN 150 mm material, total length: V2= 566.97 m, V7= 504.4 - Saloon shafts, C30/37-7 pcs - Saloon nodes -…
Show full description
… Installation set - 4 pcs - Overhead hydrants - 10 pcs - Mud discharges - 2 pcs - Ventilation-air valves - 4 pcs - Preparation of execution projects, recording of the performed state, study of the performed state and supporting documentation necessary for carrying out works and obtaining Usage permits.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| EUROHERC osiguranje d.d. | 5 | 2024–2026 |
| IKOM Industrija komunalne opreme i mjerila, dioničko društvo | 3 | 2025–2026 |
| DEZINSEKCIJA, d. o. o. | 2 | 2025–2026 |
| HEP-Opskrba d.o.o. | 2 | 2025 |
| INA - Industrija nafte d.d., Zagreb | 2 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.