Raamovereenkomst Studies
Belgium · Brussel · how to bid here →
Your path to submission
- Deadline: 19 October at 00:00 — 38 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 8 bids (17 procedures with a bid count); 6% ended with a single bidder. Sector: median 4 bids.n = 17
- 0% of this buyer's awards went to companies that had already won here before (18 awards since 2018, spread over 16 companies). 100% went to new names.n = 18 awards since 2018
- 11% of awards went to companies from abroad (18 awards with a known winner country). Sector average: 16%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Belgium · Architecture & engineering, 265 contracts went to foreign companies over the last 3 years (of 2,081 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 21 (from 5 awards).
What the buyer is looking for
De afdeling Energie-Efficiëntie van het Vlaams Energiebedrijf (hierna “veb”) biedt ter ondersteuning van haar klanten diverse energiebesparende en renovatieoplossingen aan. Via deze Raamovereenkomst wil veb de opmaak van studiedossiers voor patrimonia in eigendom van of beheerd door de Opdrachtgevers, bepaald in § 2.2 van het Bestek, faciliteren. Deze studiedossiers hebben betrekking op de energetische renovatie van de gebouwschil en diverse technieken, of op een mogelijke Totaalrenovatie van gebouwen. De beoogde Opdrachtnemers voor onderhavige Raamovereenkomst zijn studiebureaus.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD, NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Artes Uptech | 1 | 2026 |
| BeauVent cv | 1 | 2026 |
| CERTIMAX-ECOPLATFORM | 1 | 2026 |
| d4front BV | 1 | 2026 |
| E-Klips Engineering | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.