SONNENKRAFTWERK NÖ - LOS A60 - LK Hochegg - Elektroarbeiten
Austria · St. Pölten · how to bid here →
Your path to submission
- Deadline: 6 October at 00:00 — 25 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (27 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to GLS Energie GmbH.n = 27
- 19% of this buyer's awards went to companies that had already won here before (43 awards since 2024, spread over 33 companies). 81% went to new names.n = 43 awards since 2024
- 9% of awards went to companies from abroad (43 awards with a known winner country). Sector average: 17%.n = 43
- The median procedure drew 3 bids (40 procedures with a bid count); 5% ended with a single bidder. Sector: median 3 bids.n = 40
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Austria · Construction work, 919 contracts went to foreign companies over the last 3 years (of 6,130 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 5 (from 25 awards).
What the buyer is looking for
Das Land NÖ, p.A. Amt der NÖ Landesregierung, Abt. Gebäude- und Liegenschaftsmanagement beabsichtigt - im Zuge des Projektes SONNENKRAFTWERK NÖ – die Errichtung von Photovoltaikanlagen auf NÖ Landesgebäuden. Hierfür werden nun die ELEKTROARBEITEN samt Nebenleistungen für ein LOS am unter Pkt. 3.1.2 örtliche Lage aufgezählten Standort vergeben. Einzelne Komponenten wie PV Module, Wechselrichter und AC-Verteiler mit integrierter Fernwirktechnik werden seitens des AG beigestellt. Das LOS A60 betrifft die Errichtung einer Photovoltaikanlage am Areal des Landesklinium Hochegg mit einer Leistung von rund 400 kWp
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Held & Francke Baugesellschaft m.b.H. | 3 | 2025–2026 |
| G4S Secure Solutions GmbH | 3 | 2026 |
| Klenk & Meder Ges.m.b.H. | 2 | 2025 |
| siwacht Bewachungsdienst GmbH | 2 | 2026 |
| Maschinenring-Service NÖ-Wien | 2 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.