E90094/70/0-Dion7/2026, 8943 Aigen i. Ennstal, FIH FIALA FERNBRUGG, NeuErr. Autarkie, Netzersatzanlge und Photovoltaikanlage, Elektrotechnik, offenes Verfahren, OSB, Bestbieter
Austria · Wien · how to bid here →
Your path to submission
- Deadline: 22 September at 00:00 — 11 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (22 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to AustroBau GmbH.n = 22
- 7% of this buyer's awards went to companies that had already won here before (28 awards since 2024, spread over 26 companies). That is well below the sector norm (27%) — this buyer switches suppliers more often than others.n = 28 awards since 2024
- 11% of awards went to companies from abroad (28 awards with a known winner country). Sector average: 17%.n = 28
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Austria · Construction work, 919 contracts went to foreign companies over the last 3 years (of 6,130 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 5 (from 15 awards).
What the buyer is looking for
E90094/70/0-Dion7/2026, 8943 Aigen i. Ennstal, FIH FIALA FERNBRUGG, NeuErr. Autarkie, Netzersatzanlge und Photovoltaikanlage, Elektrotechnik
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Ing. Hans Bodner Bauges.m.b.H. & Co. KG. | 2 | 2026 |
| Ortner Ges.m.b.H. | 2 | 2026 |
| Pittel+Brausewetter Gesellschaft m.b.H. | 1 | 2026 |
| Porr GmbH | 1 | 2026 |
| Raiffeisen Lagerhaus Zwettl | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.