Dograditev objekta enote vrtca Dramlje _ GOI dela
Slovenia · Šentjur · how to bid here →
Your path to submission
- Deadline: 21 September at 00:00 — 10 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLV.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (21 awards since 2019, spread over 9 companies). That is well below the sector norm (61%) — this buyer switches suppliers more often than others.n = 21 awards since 2019
- 24% of awards went to companies from abroad (21 awards with a known winner country). Sector average: 5%.n = 21
- The median procedure drew just one bid (17 procedures with a bid count); 65% ended with a single bidder. Sector: median 2 bids.n = 17
- 77% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 98%.n = 9
- The award came in at a median 85% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 84%.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Foreign bidders
In Slovenia · Construction work, 10 contracts went to foreign companies over the last 3 years (of 1,355 recorded awards).
Typical field: median 5 (from 3 awards).
Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.
What the buyer is looking for
Dograditev objekta enote vrtca Dramlje _ GOI dela
Description as published (DE).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLV.
Contract
BuyerOBČINA ŠENTJUR
TypeWorks
Estimated valuevalue not published
Published10 September 2026
CategoryConstruction work · CPV 45200000
Who has won here before
| Company | Awards | Period |
|---|---|---|
| LESNINA MG OPREMA podjetje za inženiring, d.d., Ljubljana | 1 | 2024 |
| ATLAS OPREMA, podjetje za proizvodnjo in trgovino z notranjo opremo, d.o.o. | 1 | 2024 |
| ECE, energetska družba, d.o.o. | 1 | 2024 |
| ELAN INVENTA, družba za proizvodnjo in storitve, d.o.o. | 1 | 2024 |
| GEN-I, trgovanje in prodaja električne energije, d.o.o. | 1 | 2025 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.
How often this buyer tenders this
20246
20252
20261
Who knows the rhythm prepares instead of reacting.
·
days until the deadline — Monday 21 September at 00:00
How to bid
Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
Tender documents — direct download
Specifications and annexes hosted by the buyer — usually accessible without registration.
Tenders like this, every morning at 7:30 in your inbox.
Register now →