Architect and Building (M and E) Services Engineer Led Design Team Consultancy Services for SEAI Local Authority Energy Pathfinder Programme 2 - Galway County Council
Ireland · County Galway · how to bid here →
Your path to submission
- Deadline: 9 October at 00:00 — 28 days left.
- You submit on eTenders Ireland — not here and not by e-mail. ↗
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (25 awards, most recently December 2025) — by that rhythm the next award was due around March 2026. The last award went to PUNCH Consulting Engineers.n = 25
- 24% of this buyer's awards went to companies that had already won here before (153 awards since 2013, spread over 96 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 153 awards since 2013
- The median procedure drew 4 bids (143 procedures with a bid count); 17% ended with a single bidder. Sector: median 6 bids.n = 143
- 4% of awards went to companies from abroad (153 awards with a known winner country). Sector average: 8%.n = 153
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Ireland · Architecture & engineering, 271 contracts went to foreign companies over the last 3 years (of 4,523 recorded awards) — mostly from United Kingdom, Spain, France.
Typical field: median 3 (from 17 awards).
What the buyer is looking for
The services contract is to provide an Architect and Building (M and E) Services Engineering Led Integrated Design Team Consultancy Services for: The Sustainable Energy Authority of Ireland (SEAI) and the Local Authority have agreed to collaborate on the delivery of an Energy Efficiency and Decarbonisation Pathfinder Programme for the Local Authority sector (the 'Pathfinder'). The shared objective of SEAI and Local Authority is to implement a range of energy efficiency and decarbonisation measures in a small number of typical Local Authority buildings, to test a variety of approaches with a view to developing a scalable model for decarbonisation of the Local Authority building stock going forward should funding become available.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in ENG.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| MANNION BUILD | 5 | 2016–2025 |
| C and N Higgins Construction ltd | 4 | 2020–2022 |
| Hassett Leyden and Associates | 4 | 2021–2023 |
| Finna Construction Ltd | 3 | 2020–2023 |
| PUNCH Consulting Engineers | 3 | 2017–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.