Architect Led Multidisciplinary Design Team Services
Ireland · Dublin · how to bid here →
Your path to submission
- Deadline: 15 October at 00:00 — 34 days left.
- You submit on eTenders Ireland — not here and not by e-mail. ↗
- Offer and evidence in: ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (21 awards, most recently July 2026) — the next award is due around September 2026 by that rhythm. The last award went to AECOM Ireland Limited_15958.n = 21
- 30% of this buyer's awards went to companies that had already won here before (250 awards since 2013, spread over 132 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 250 awards since 2013
- The median procedure drew 4 bids (221 procedures with a bid count); 10% ended with a single bidder. Sector: median 6 bids.n = 221
- The award came in at a median 100% of the estimated value (48 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 100%.n = 48
- 10% of awards went to companies from abroad (250 awards with a known winner country). Sector average: 8%.n = 250
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 10/09/2026.
Foreign bidders
In Ireland · Architecture & engineering, 271 contracts went to foreign companies over the last 3 years (of 4,523 recorded awards) — mostly from United Kingdom, Spain, France.
Typical field: median 3 (from 19 awards).
What the buyer is looking for
Architect Led Multi-Disciplinary Design Team Services for Delivery of Building Extension at Mullingar Advanced Building Solution, IDA Ardmore Business and Technology Park, Mullingar, Co. Westmeath
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in ENG.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| O'Connor Sutton Cronin | 5 | 2020–2026 |
| MCB Civils Limited | 5 | 2023–2025 |
| Total Highway Maintenance Ltd | 4 | 2019–2025 |
| Donal O Buachalla and Co Limited | 4 | 2022–2024 |
| Tracey Brothers Ltd | 4 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.