Dogradnja proizvodno-skladišnog farmaceutskog objekta u Dugopolju
Croatia · Dugopolje · how to bid here →
Your path to submission
- Deadline: 11 September at 00:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HRV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 27% of this buyer's awards went to companies that had already won here before (12 awards since 2018, spread over 4 companies). That is well below the sector norm (68%) — this buyer switches suppliers more often than others.n = 12 awards since 2018
- 33% of awards went to companies from abroad (12 awards with a known winner country). Sector average: 1%.n = 12
- The award came in at a median 125% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 93%.n = 7
- Across 16 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (16 of 16), Minimum annual turnover (16 of 16), Professional liability insurance (13 of 16), References: works (13 of 16).n = 16
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Croatia · Construction work, 12 contracts went to foreign companies over the last 3 years (of 2,064 recorded awards).
Typical field: median 3 (from 1,562 awards).
What the buyer is looking for
The subject of the procurement is the upgrading of an already existing production and storage pharmaceutical facility to a common ground. 5861/338 and frequent.zem. 5861/459 K.O. Dugopolje built in accordance with a turnkey system. The already existing pharmaceutical building that was built is located on the building plot 5861/459 K.O. Dugopolje, while on the plot. 5861/338 K.O. Dugopolje perform construction works of the object that is the subject of the procurement, which the object will be functionally and technologically connected to the already existing object and will form a single funkiconal whole. A detailed description of the subject matter of the procurement and the type and scope of the works, as well as the specific requirements related to their execution, are set out in detail in the project documentation and cost statement, which are an integral part of this Procurement Document.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| I.S. d.o.o. | 3 | 2018–2023 |
| HEP - Opskrba d.o.o. | 2 | 2021–2022 |
| HEP-Opskrba d.o.o. | 1 | 2025 |
| Gollmann Kommissioniersysteme GmbH | 1 | 2022 |