Zpracování projektové dokumentace (DPZ+DPS) "Rekonstrukce budovy v úl. Husova čp.145 - umístění kanceláři MěÚ Kutná Hora"
Czechia · Kutná Hora · how to bid here →
Your path to submission
- Deadline: 12 October at 00:00 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 6% of this buyer's awards went to companies that had already won here before (35 awards since 2015, spread over 14 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 35 awards since 2015
- In this sector the buyer awards roughly every 5 months (4 awards, most recently March 2026) — the next award is due around September 2026 by that rhythm. The last award went to Peter Mark s.r.o..n = 4
- The median procedure drew 4 bids (24 procedures with a bid count); 17% ended with a single bidder. Sector: median 4 bids.n = 24
- The award came in at a median 74% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 79%.n = 5
- 6% of awards went to companies from abroad (35 awards with a known winner country). Sector average: 8%.n = 35
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Czechia · Architecture & engineering, 434 contracts went to foreign companies over the last 3 years (of 15,473 recorded awards) — mostly from Germany, France, Austria.
Typical field: median 4 (from 11,164 awards).
What the buyer is looking for
Zpracování dvoustupňové projektové dokumentace (DPZ+DPS) "Rekonstrukce budovy v úl. Husova čp.145 - umístění kanceláři MěÚ Kutná Hora" a to v rozsahu § 158 zákona č. 283/2021 Sb., stavební zákon, dále v rozsahu služeb s výkazem výměr, a v souladu s vyhláškou č. 131/2024 Sb., o dokumentaci staveb, ve znění pozdějších předpisů se zapracovanými případnými připomínkami a požadavky dotčených orgánů státní správy a ostatních účastníků stavebního řízení.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Elkoplast CZ, s.r.o. · 76001 CZ | 2 | 2022 |
| ČEZ ESCO, a.s. | 2 | 2022 |
| Atelier M.A.A.T., s.r.o. | 1 | 2026 |
| AV Media; a.s. | 1 | 2015 |
| AVE CZ odpadové hospodářství s.r.o. | 1 | 2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.