Développement, l’adaptation et le déploiement d'outils pour la mise en oeuvre de la réglementation relative à la qualité de l'air intérieur dans les lieux fermés accessibles au public
Belgium · Saint-Josse-ten-Noode · how to bid here →
Your path to submission
- Deadline: 19 October at 00:00 — 39 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (24 awards, most recently December 2025) — by that rhythm the next award was due around April 2026. The last award went to T&D Security.n = 24
- The median procedure drew 2 bids (54 procedures with a bid count); 41% ended with a single bidder. Sector: median 5 bids.n = 54
- 6% of this buyer's awards went to companies that had already won here before (112 awards since 2015, spread over 57 companies). 94% went to new names.n = 112 awards since 2015
- 36% of awards went to companies from abroad (112 awards with a known winner country). Sector average: 29%.n = 112
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Belgium · Business services, 694 contracts went to foreign companies over the last 3 years (of 3,003 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 7 (from 6 awards).
What the buyer is looking for
Le présent marché porte sur le développement, l’adaptation, la mise à jour et le déploiement d’outils destinés à soutenir la mise en oeuvre de la loi du 6 novembre 2022 visant à l’amélioration de la qualité de l’air intérieur dans les lieux fermés accessibles au public ainsi que de ses arrêtés d’exécution. Il vise notamment à améliorer les outils existants, à développer de nouveaux outils lorsque cela s’avère nécessaire et à faciliter leur appropriation par les exploitants et autres acteurs concernés.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA, NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| INSTITUT DE CONSEIL ET D'ETUDES EN DEVELOPPEMENT DURABLE en abrégé "ICEDD" | 3 | 2024–2026 |
| Universiteit Gent | 2 | 2024 |
| Event Pilots | 2 | 2024 |
| Vlaamse Instelling voor Technologisch Onderzoek · Mol | 2 | 2024–2026 |
| EUROPOWER GENERATORS | 2 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.