Projektiranje, tehnično svetovanje in projektantski nadzor
Slovenia · Celje · how to bid here →
Your path to submission
- Deadline: 20 October at 00:00 — 40 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLV, SLV.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 1 months (98 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to ARHAT, arheološke raziskave, Aleš Tiran s.p..n = 98
- 23% of this buyer's awards went to companies that had already won here before (935 awards since 2017, spread over 263 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 935 awards since 2017
- 176% of the bids received came from small and medium-sized enterprises (417 procedures with a bid mix). Sector: 133%.n = 417
- The median procedure drew just one bid (805 procedures with a bid count); 51% ended with a single bidder. Sector: median 2 bids.n = 805
- The award came in at a median 92% of the estimated value (154 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 154
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Slovenia · Architecture & engineering, 19 contracts went to foreign companies over the last 3 years (of 1,158 recorded awards).
Typical field: median 1 (from 75 awards).
What the buyer is looking for
S predmetnim javnim naročilom naročnik poziva ponudnike k oddaji ponudbe za sklenitev okvirnega sporazuma za obdobje 36 mesecev: - v vrednosti 1.100.000,00 EUR brez DDV za sklop 1 - Projekti ESO v predorih; - v vrednosti 2.500.000,00 EUR brez DDV za sklop 2 - Projekti ESO na odprti trasi AC.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLV, SLV.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KOLEKTOR CESTNO PODJETJE NOVA GORICA, Družba za vzdrževanje in gradnjo cest, d.o.o. | 10 | 2024–2026 |
| POMGRAD, gradbeno podjetje d.d. | 10 | 2024–2026 |
| CGP, družba za gradbeništvo, inženiring, proizvodnjo in vzdrževanje cest, d.d. | 9 | 2024–2026 |
| RIKO RIBNICA d.o.o. Ribniška industrija kovinske opreme | 9 | 2024–2026 |
| BENUSSI, podjetje za trgovino, d.o.o. | 9 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.