Software Brokerfunctie 2027-2034
Netherlands · AMSTERDAM · how to bid here →
Your path to submission
- Deadline: 26 October at 00:00 — 46 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2018, spread over 5 companies). 100% went to new names.n = 14 awards since 2018
- The median procedure drew 3 bids (11 procedures with a bid count); 18% ended with a single bidder. Sector: median 2 bids.n = 11
- 61% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 47%.n = 5
- 7% of awards went to companies from abroad (14 awards with a known winner country). Sector average: 7%.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Netherlands · Software & IT systems, 38 contracts went to foreign companies over the last 3 years (of 788 recorded awards) — mostly from Germany, France, Finland.
Typical field: median 2 (from 535 awards).
What the buyer is looking for
GVB heeft voor de uitvoering van zijn taken behoefte aan de levering van standaardsoftware, onderhoud en gerelateerde dienstverlening zoals (Licentie)-adviesdiensten en software asset management diensten. GVB wenst één Raamovereenkomst te sluiten met één leverancier die in staat is deze software, inclusief onderhoud en gerelateerde dienstverlening, te leveren. Op basis van de in de Raamovereenkomst opgenomen procedures en bepalingen zullen nadere opdrachten worden verstrekt via nadere overeenkomsten. De Opdracht richt zich primair op de levering van Standaardsoftware, waarbij geen maatwerk wordt gevraagd (Maatwerk-software valt, tenzij anders aangegeven, buiten scope van de Opdracht). De intentie is om de Raamovereenkomst in januari 2027 in werking te laten treden, dan wel op een vroeger of later moment als de definitieve gunning daartoe aanleiding geeft. Zie leidraad
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Hemubo Almere B.V. | 1 | 2024 |
| ALSTOM Netherlands B.V. | 1 | 2025 |
| Heijmans Utiliteit B.V. | 1 | 2024 |
| K_Dekker bouw & infra b.v. | 1 | 2024 |
| PeoplePower B.V. | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.