Raamovereenkomst groenaanleg en -renovatie in de gemeente Land van Cuijk
Netherlands · Boxmeer · how to bid here →
Your path to submission
- Deadline: 28 September at 00:00 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (7 awards, most recently May 2024) — by that rhythm the next award was due around July 2024. The last award went to Terra Nostra B.V..n = 7
- 6% of this buyer's awards went to companies that had already won here before (70 awards since 2022, spread over 55 companies). That is well below the sector norm (30%) — this buyer switches suppliers more often than others.n = 70 awards since 2022
- The award came in at a median 60% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 100%.n = 5
- The median procedure drew 3 bids (60 procedures with a bid count); 20% ended with a single bidder. Sector: median 3 bids.n = 60
- 64% of the bids received came from small and medium-sized enterprises (43 procedures with a bid mix). Sector: 78%.n = 43
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Netherlands · Agricultural services, 9 contracts went to foreign companies over the last 3 years (of 1,961 recorded awards).
Typical field: median 3 (from 7 awards).
What the buyer is looking for
Met deze aanbesteding beoogt de opdrachtgever een overeenkomst te sluiten om het groen, in de breedste zin van het woord, aan te leggen en om het onderhoud voor een periode van totaal maximaal vier (4) jaar uit te voeren voor diverse locaties in de gemeente Land van Cuijk 0
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Engelen-Groen Uden B.V. | 3 | 2023–2025 |
| NieuwCo B.V. | 2 | 2024–2025 |
| Bochane Groep B.V. | 2 | 2024 |
| QS Nederland B.V. | 1 | 2024 |
| REGAIN Recyclables B.V. | 1 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.