AWV/OND/2026/1_Leveren, installeren en exploiteren van een strooimanagementsysteem voor gladheidsbestrijding
Belgium · Brussel · how to bid here →
Your path to submission
- Deadline: 18 September at 00:00 — 9 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (59 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to RedPencil.n = 59
- 24% of this buyer's awards went to companies that had already won here before (929 awards since 2022, spread over 687 companies). 76% went to new names.n = 929 awards since 2022
- The median procedure drew 4 bids (52 procedures with a bid count); 12% ended with a single bidder. Sector: median 5 bids.n = 52
- 18% of awards went to companies from abroad (929 awards with a known winner country). Sector average: 30%.n = 929
- The award came in at a median 93% of the estimated value (17 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 17
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Belgium · IT services, 505 contracts went to foreign companies over the last 3 years (of 1,982 recorded awards) — mostly from France, Germany, Luxembourg.
Typical field: median 2 (from 7 awards).
What the buyer is looking for
Het doel van de opdracht is het leveren, installeren en exploiteren van een applicatie (strooimanagementsysteem) dewelke de mogelijkheid biedt om het uitvoerende proces van de gladheidsbestrijding van het Agentschap Wegen en Verkeer te faciliteren en in beeld te brengen. De real-time data/informatie dewelke afkomstig is van het gladheidbestrijdingsmaterieel dient hierbij als basis en het strooimanagementsysteem moet deze informatie leesbaar weergeven waardoor AWV duidelijk inzicht krijgt in de strooiacties (zowel live als achteraf).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Sweco Belgium | 11 | 2024–2026 |
| Krinkels | 10 | 2024–2026 |
| WILLEMEN INFRA | 10 | 2024–2026 |
| A.B.O.G. | 9 | 2024–2026 |
| SWECO | 6 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.