VE Generalunternehmer MP16
Austria · Wien · how to bid here →
Your path to submission
- Deadline: 3 November at 00:00 — 55 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 0% of this buyer's awards went to companies that had already won here before (10 awards since 2015, spread over 1 companies). That is well below the sector norm (27%) — this buyer switches suppliers more often than others.n = 10 awards since 2015
- The median procedure drew 3 bids (8 procedures with a bid count); 0% ended with a single bidder. Sector: median 3 bids.n = 8
- 10% of awards went to companies from abroad (10 awards with a known winner country). Sector average: 17%.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Austria · Construction work, 919 contracts went to foreign companies over the last 3 years (of 6,130 recorded awards) — mostly from Germany, France, Italy.
Typical field: median 3 (from 824 awards).
What the buyer is looking for
Errichtet wird ein rd. 8.000m² großer Mistplatz mit Rampenanlage und Abwurf in tiefer stehende Mulden auszuführen. Weiters ist eine rd. 4.500m² große Tiefgarage für die Straßenreinigung, Müllabfuhr und Einrichtungen für den Winterdienst (Salzsilo, Soleanlagen, usw.) umzusetzen. Für die MitarbeiterInnen des Standortes ist ein ca. 900m² großes Betriebsgebäude im Obergeschoß des Mistplatzes.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Zechner & Zechner ZT GmbH/Werner Consult ZT GmbH | 1 | 2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.