Mountrath Town Centre Public Realm Improvement Scheme
Ireland · Portlaoise · how to bid here →
Your path to submission
- Deadline: 17 September at 00:00 — 8 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (18 awards, most recently February 2026) — by that rhythm the next award was due around June 2026. The last award went to Civic Plus Limited.n = 18
- 23% of this buyer's awards went to companies that had already won here before (244 awards since 2013, spread over 185 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 244 awards since 2013
- The median procedure drew 3 bids (218 procedures with a bid count); 29% ended with a single bidder. Sector: median 6 bids.n = 218
- The award came in at a median 94% of the estimated value (19 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 100%.n = 19
- 3% of awards went to companies from abroad (244 awards with a known winner country). Sector average: 7%.n = 244
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Ireland · Architecture & engineering, 271 contracts went to foreign companies over the last 3 years (of 4,523 recorded awards) — mostly from United Kingdom, Spain, France.
Typical field: median 3 (from 12 awards).
What the buyer is looking for
Laois County Council seeks to appoint a Single Service Provider, Urban Planning Led Multi-Disciplinary Design Team, PSDP, for Project Stages (i) to (ii b) the Mountrath Town Centre Public Realm Improvement Scheme. Stage details are as follows: Stage (i) Town Spatial Strategy for Mountrath Town, Stage (ii a) Town Centre Design (focusing on the Town Centre as identified in Drawing No. 100) and Stage (ii b) Developed Design and Planning (Part 8). Design Documents, Drawings, Surveys, Reports etc. will be provided/submitted to the Contracting Authority for future use in subsequent project stages. Subsequent project stages (Detailed Design, Tender Action, Contract Award, Construction and Handover) will be the subject of a separate tender in the future which will be dependent on the availability of funding
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in ENG.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| HPMP Fire c/o High Precision Motor Products | 7 | 2019–2026 |
| Breencore ltd | 5 | 2014–2025 |
| Ground Investigations Ireland Ltd | 4 | 2021–2024 |
| Terry higgins Builders | 4 | 2022–2025 |
| Campion construction | 4 | 2017–2022 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.