EA Bouwkundig onderhoud
Netherlands · Utrecht · how to bid here →
Your path to submission
- Deadline: 20 October at 00:00 — 41 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (13 awards, most recently July 2026) — the next award is due around November 2026 by that rhythm. The last award went to Dräger Nederland B.V..n = 13
- 29% of this buyer's awards went to companies that had already won here before (255 awards since 2015, spread over 180 companies). That is well above the sector norm (9%) — newcomers have a harder time here than elsewhere.n = 255 awards since 2015
- 58% of the bids received came from small and medium-sized enterprises (12 procedures with a bid mix). Sector: 102%.n = 12
- The median procedure drew 2 bids (40 procedures with a bid count); 20% ended with a single bidder. Sector: median 3 bids.n = 40
- 12% of awards went to companies from abroad (255 awards with a known winner country). Sector average: 5%.n = 255
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Netherlands · Repair & maintenance, 48 contracts went to foreign companies over the last 3 years (of 1,174 recorded awards) — mostly from Germany, France, Belgium.
Typical field: median 3 (from 6 awards).
What the buyer is looking for
Wij nodigen u graag uit om een inschrijving in te dienen voor de opdracht voor het bouwkundig onderhoud van de diverse gebouwen van de Universiteit Utrecht, op het Utrecht Science Park (USP), International Campus Utrecht (ICU) en in de binnenstad van Utrecht. Wij schatten de gemiddelde waarde van het correctief onderhoud op €450.000,- excl. btw per jaar. De verwachte waarde van het preventief onderhoud is €60.000,- excl. btw per jaar. Aan deze inschattingen kunt u geen rechten ontlenen.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| FS NL Poortgebouw Opco 16 CP B.V | 3 | 2025 |
| Fletcher Hotel Exploitaties B.V | 3 | 2025 |
| FIGI B.V | 3 | 2025 |
| Eye Hotel B.V | 3 | 2025 |
| EHM Hotel Utrecht B.V | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.