Bahnmark Karsdorf ( Oberbau, KTB, Bautechnik, 50Hz)
Germany · Frankfurt Main · how to bid here →
Your path to submission
- Deadline: 28 September at 00:00 — 19 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 85% of this buyer's awards went to companies that had already won here before (7,891 awards since 2024, spread over 1,119 companies). That is well above the sector norm (41%) — newcomers have a harder time here than elsewhere.n = 7,891 awards since 2024
- The median procedure drew just one bid (6,123 procedures with a bid count); 55% ended with a single bidder. Sector: median 3 bids.n = 6,123
- The award came in at a median 100% of the estimated value (14 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 100%.n = 14
- Across 179 procedures with structured selection criteria, this buyer most often required: Security of supply required (174 of 179), Technical staff for execution (7 of 179), Trade register enrolment (4 of 179), Professional register enrolment (3 of 179).n = 179
- 2% of awards went to companies from abroad (7,891 awards with a known winner country). Sector average: 0%.n = 7,891
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Germany · Construction work, 649 contracts went to foreign companies over the last 3 years (of 238,564 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 1 (from 1,939 awards).
What the buyer is looking for
Die Komplexmassnahme Karsdorf umfasst die Erneuerung der Bahninfrastruktur im Bahnhof Karsdorf im Zuge des ESTW Neubaus der Modernisierung technischer Anlagen sowie der Erneuerung von zwei Bahnuebergaengen Ziel ist ein leistungsfaehiger und regelkonformer Anlagenzustand bei Aufrechterhaltung des Verkehrs Der Leistungsumfang beinhaltet Oberbau Erneuerung von Gleisen und Weichen inklusive Schotter und Schwellenarbeiten Tiefbau Kabeltiefbau Kabeltrassen fuer LST und EEA Querungen Oberflaechenwiederherstellung sowie Entwaesserungs und Ingenieurbauleistungen Bautechnik Neubau Anpassung und Rueckbau baulicher Anlagen fuer ESTW und zugehoerige Technik Elektroenergieanlagen 50 Hz Erneuerung der Gleisfeldbeleuchtung Weichenheizungen Energieverteilungen und Kabelanlagen
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DB Engineering & Consulting GmbH · Berlin | 650 | 2024–2026 |
| Siemens Mobility GmbH | 502 | 2024–2026 |
| Hitachi Rail GTS Deutschland GmbH | 343 | 2024–2026 |
| DB Bahnbau Gruppe GmbH · Berlin | 209 | 2024–2026 |
| GTU Mobility GmbH & Co. KG · Hannover | 126 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.