N2 Diestsesteenweg te Leuven, uitvoeringsstudie - Knoop Kessel-Lo
Belgium · Brussel · how to bid here →
Your path to submission
- Deadline: 6 October at 00:00 — 28 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 1 months (137 awards, most recently August 2026) — the next award is due around September 2026 by that rhythm. The last award went to To70 BELGIUM.n = 137
- 24% of this buyer's awards went to companies that had already won here before (929 awards since 2022, spread over 687 companies). That is well above the sector norm (10%) — newcomers have a harder time here than elsewhere.n = 929 awards since 2022
- The median procedure drew 4 bids (52 procedures with a bid count); 12% ended with a single bidder. Sector: median 4 bids.n = 52
- The award came in at a median 93% of the estimated value (17 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 17
- 18% of awards went to companies from abroad (929 awards with a known winner country). Sector average: 16%.n = 929
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Belgium · Architecture & engineering, 265 contracts went to foreign companies over the last 3 years (of 2,081 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 4 (from 11 awards).
What the buyer is looking for
Het voorwerp van de opdracht betreft de uitvoeringsstudie van de N2 Diestsesteenweg in Leuven, ter hoogte van de Knoop van Kessel-Lo. De projectzone situeert zich in het gebied tussen de Vuurkruisenlaan/Diestsepoort en de Kerkstraat/Lindensestraat.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Sweco Belgium | 11 | 2024–2026 |
| Krinkels | 10 | 2024–2026 |
| WILLEMEN INFRA | 10 | 2024–2026 |
| A.B.O.G. | 9 | 2024–2026 |
| SWECO | 6 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.