Gradnja stanovanjske soseske Ob Savi, Kranj s komunalno opremo
Slovenia · Ljubljana · how to bid here →
Your path to submission
- Deadline: 2 October at 00:00 — 24 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLV.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 9% of this buyer's awards went to companies that had already won here before (24 awards since 2024, spread over 22 companies). That is well below the sector norm (62%) — this buyer switches suppliers more often than others.n = 24 awards since 2024
- In this sector the buyer awards roughly every 5 months (6 awards, most recently March 2026) — by that rhythm the next award was due around August 2026. The last award went to POMGRAD, gradbeno podjetje d.d..n = 6
- 158% of the bids received came from small and medium-sized enterprises (7 procedures with a bid mix). Sector: 104%.n = 7
- The award came in at a median 95% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 84%.n = 13
- The median procedure drew 3 bids (7 procedures with a bid count); 14% ended with a single bidder. Sector: median 3 bids.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Slovenia · Construction work, 10 contracts went to foreign companies over the last 3 years (of 1,355 recorded awards).
Typical field: median 3 (from 3 awards).
What the buyer is looking for
Predmet naročila je izbira izvajalca za izgradnjo 269 stanovanjskih enot v desetih večstanovanjskih objektih Ob Savi, Kranj s pripadajočo zunanjo, prometno ter krajinsko ureditvijo ter priključki na obstoječo komunalno, energetsko in prometno infrastrukturo in izvedbo javne komunalne opreme.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLV.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TEMIDA podjetje za računalniški inženiring, d.o.o. Ljubljana | 2 | 2025 |
| ECE, energetska družba, d.o.o. | 2 | 2024–2025 |
| POMGRAD, gradbeno podjetje d.d. | 1 | 2026 |
| REMONT obrtno gradbeno podjetje, d.d. | 1 | 2025 |
| SAVAPROJEKT družba za razvoj, projektiranje, konzalting, inženiring d.d. Krško | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.