Výstavba fotovoltickej elektrárne – Petržalka a Senica
Slovakia · how to bid here →
Your path to submission
- Deadline: 18 September at 08:00 — 11 days left.
- You submit on ÚVO / EVO — not here and not by e-mail. ↗
- Offer and evidence in: SLK, CES, SLK, CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 257% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 102%.n = 10
- 24% of this buyer's awards went to companies that had already won here before (51 awards since 2024, spread over 39 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 51 awards since 2024
- The median procedure drew 2 bids (10 procedures with a bid count); 20% ended with a single bidder. Sector: median 5 bids.n = 10
- The award came in at a median 58% of the estimated value (17 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 17
- 12% of awards went to companies from abroad (51 awards with a known winner country). Sector average: 25%.n = 51
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 07/09/2026.
Foreign bidders
In Slovakia · Construction work, 71 contracts went to foreign companies over the last 3 years (of 1,057 recorded awards) — mostly from Germany, Czechia, Poland.
Typical field: median 5 (from 460 awards).
What the buyer is looking for
1. Predmetom zákazky je dodávka a realizácia dvoch fotovoltických elektrární na prevádzkach Čistiarne odpadových vôd Petržalka a Čistiarne odpadových vôd Senica podľa špecifikácie a za podmienok uvedených v Časti B. Zmluvné podmienky súťažných podkladov. 2. Predmet zákazky je rozdelený na dve samostatné časti - Časť 1 - ČOV Petržalka – Výstavba fotovoltickej elektrárne a Časť 2 - ČOV Senica – Výstavba fotovoltickej elektrárne. 3. Podrobný opis predmetu zákazky a ďalšie požiadavky na spôsob vykonania diela a ostatných plnení tvoriacich predmet zákazky sa nachádza v jednotlivých prílohách Časti B. Zmluvné podmienky súťažných podkladov.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLK, CES, SLK, CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ALAS SLOVAKIA, s.r.o. | 4 | 2025–2026 |
| Danucem Slovensko a.s. | 3 | 2025 |
| Radeton SK s.r.o. | 2 | 2025–2026 |
| G&E Trading, a.s. | 2 | 2026 |
| Sensus Slovensko a.s. | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.