How to bid in this country: portals, deadlines, thresholds →
Design and execution services of Rehabilitation P.T. 2 Drumul Sarii (constructions) str. Lieutenant Colonel Constantin Marinescu nr.7, Sector 5 Bucharest
Servicii de proiectare si executie lucrari de Reabilitare P.T. 2 Drumul Sarii (constructii) str. Locotenent Colonel Constantin Marinescu nr.7, Sector 5 Bucuresti — original title
Your path to submission
- Deadline: 2 December at 15:00 — 31 days left.
- You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
‘Design and execution services for Rehabilitation works P.T. 2 Drumul Sarii (constructions) str. Lieutenant Colonel Constantin Marinescu nr.7, Sector 5 Bucharest", by awarding a sectoral contract for the design and execution of works with a duration not exceeding 12 months. The categories of specialized works covered by these Specifications are as follows: plumbing works, construction (resistance and architecture). Location: Thermal Point 2 Drumul Sarii is located in Bucharest, Sector 5, str. Lieutenant Colonel Constantin Marinescu, no. 7. Development phases subject to contracting: a. Technical project of execution and project for organizing the execution of works; b. Purchase of equipment, materials; c. Execution works; d. Technical assistance in the execution of works from the designer; e. Preparation of AS-BUILT documentation; f. Preparation of the Technical Book of…
Show full description
… Construction. Deadlines for submission/response to requests for clarifications/additional information: A. In accordance with Article 172(1) of Law No 99/2016, as amended, the deadline for any interested economic operator to request clarifications or additional information in relation to the tender documentation is 20 days before the closing date for submission of tenders. B. In accordance with Article 172(2) of Law No 99/2016, as subsequently amended and supplemented, the contracting entity shall respond clearly and completely to all requests for clarification/additional information on the 12th day before the deadline set for the submission of tenders.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (20 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to URBIA SECTOR 2 SOCIETATE PE ACTIUNI.n = 20
- The median procedure drew just one bid (12 procedures with a bid count); 67% ended with a single bidder. Sector: median 5 bids.n = 12
- 41% of this buyer's awards went to companies that had already won here before (442 awards since 2024, spread over 260 companies). That is well below the sector norm (59%) — this buyer switches suppliers more often than others.n = 442 awards since 2024
- 91% of the bids received came from small and medium-sized enterprises (12 procedures with a bid mix). Sector: 65%.n = 12
- Across 3 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (3 of 3), References: supplies (2 of 3), Share of subcontractors (2 of 3), Independent quality certificate (e.g. ISO 9001) (2 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| VOLVO ROMANIA | 10 | 2024–2026 |
| MATEROM SRL | 10 | 2024–2026 |
| COSTA UTILAJE | 8 | 2024 |
| COMPANIA ROMPREST SERVICE S.A. | 7 | 2024 |
| MVV LOGAN AUTO | 7 | 2024 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 3 completed awards — not a statement about this procedure.)
This procedure allows 37 days between publication and deadline — typical in this country is 33 (median of 2,802 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Romania · Construction work, 167 contracts went to foreign companies over the last 3 years (of 84,629 recorded awards) — mostly from France, Italy, Germany.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now