How to bid in this country: portals, deadlines, thresholds →
„Budowa chodnika od drogi krajowej 240 do Terespola Pomorskiego wzdłuż drogi powiatowej” – II postępowanie
Your path to submission
- Deadline: 17 November at 09:00 — 16 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the construction of a pavement along the county road No. 1291 in Terespol Pomorski. 2. The scope of work will include, among others: • construction of a pedestrian road, • construction of an ordinary exit, • extension of the existing culvert, • construction of green areas – escarpments and lawns, • construction of road markings, • setting road safety elements, • cleaning of the existing pedestrian road, • geodetic demarcation and as-built inventory. 3. A detailed description of the subject-matter of the contract can be found in Annex 2 to the ToR – project documentation. 4. The bill of quantities can be found in Annex 2a to the ToR. 5. The contracting authority does not require a probationary section. 6. As part of the performance of the task, the Contractor is also obliged to: • geodetic maintenance during earthworks (e.g. geodetic demarcation and…
Show full description
… as-built inventory with the inclusion of an inventory map in the geodetic resources), • execution of a temporary traffic organisation project, introduction and maintenance of temporary construction marking in accordance with the temporary traffic organisation project carried out and approved by the Contractor, • ensuring comprehensive ornithological supervision of tree felling in the case of felling during the breeding period, • works should be carried out manually within existing underground networks. In the event of insufficient covering of the cables or their collision with the designed structure of the pavement, a protection in the form of an AROT type casing pipe or equivalent should be applied, after consultation with the Supervision Inspector. 7. The Contractor undertakes to submit at the latest on the date of handover of the construction site: a) the material and financial schedule for the implementation of the investment. 8. The planned investment will be available for the needs of persons with disabilities in accordance with Article 100 of the Public Procurement Act by making new surfaces of uniform material, without cavities or railways. Guide plates (integration cubes) will be made, which will make it easier for people with visual impairments to move on the road for pedestrians. 9. The Contracting Authority does not reserve the right to apply for the award of the contract only by the Contractors referred to in Article 94 of the Public Procurement Act. 10. The Contractor is obliged to provide the Ordering Party with all documents allowing for the acceptance of the investment. 11. If the subject of the contract is specified in the design documentation, in particular as Annex 2 and Annex 2a to the tender specifications, by indicating the technology, manufacturer, proper names, trademarks or the origin of the equipment and materials, reference to standards, European technical assessments, approvals, technical specifications and technical reference systems, the Contracting Authority informs that they are only auxiliary to the determination of the basic parameters and characteristics of the materials used. The contracting authority allows the use of equivalent solutions while maintaining the same technical, technological, quality and functional standards. Equivalent products should be understood as devices and materials having not inferior technical parameters and the same functional characteristics as the product specified by the name or origin. The use of equivalent products shall in no way affect the proper functioning of the technical solutions. A list of the equivalent solutions used and accepted by the Contractor for the valuation of materials or equipment must be annexed to the tender if this is the case. Pursuant to Article 101(1) CTMR, 5 and 6 of the Public Procurement Act, the Contractor who invokes equivalent solutions is obliged to demonstrate that the supplies, services or works offered by him meet the requirements specified by the Ordering Party.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (86 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to Przedsiębiorstwo Inżynieryjne Hemar Sp. z o.o.n = 86
- The median procedure drew just one bid (21 procedures with a bid count); 52% ended with a single bidder. Sector: median 5 bids.n = 21
- 51% of this buyer's awards went to companies that had already won here before (159 awards since 2015, spread over 73 companies). 49% went to new names.n = 159 awards since 2015
- 1% of awards went to companies from abroad (159 awards with a known winner country). Sector average: 0%.n = 159
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Zakład Drogowo Mostowy Spółka z o.o. | 37 | 2021–2026 |
| Zakład Usług Komunalnych Sp. z o.o. | 15 | 2015–2026 |
| Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o. | 8 | 2021–2025 |
| Przedsiębiorstwo Inżynieryjne Hemar Sp. z o.o. | 6 | 2023–2026 |
| ENEA Oświetlenie Sp. z o.o. | 6 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 18 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now