How to bid in this country: portals, deadlines, thresholds →
„Budowa drogi gminnej Ropczyce - Gnojnica w km 0+000 - 1+259 wraz z niezbędną infrastrukturą oraz przebudowa sieci uzbrojenia terenu”
Your path to submission
- Deadline: 16 November at 10:00 — 15 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the execution of construction works under the task entitled: , ‘Construction of the Ropczyce - Gnojnica municipal road in km 0+000 - 1+259 with the necessary infrastructure and reconstruction of the land development network’, co-financed by the Government Road Development Fund. 2. The planned road system includes the construction of a municipal public road with a length of 1 259 m, the route of which coincides with the existing course of an internal road with a bituminous surface. Axle corrections occur mainly within horizontal curves in order to adapt to visibility conditions and current technical requirements. In connection with the implementation of the investment, the road with bituminous surface will be expanded, and on the section from km 0+648 until the end of the development, a pedestrian walkway on the right side is planned. In places where the…
Show full description
… road body is close to the channel of the natural watercourse, it is planned to protect the slopes with mesh and stone baskets. Dewatering will be carried out through the designed open and covered road ditches, as well as the designed rainwater sewer with the drainage of rainwater and / or meltwater into the channel of a natural watercourse without a name. The scope also includes the reconstruction of the culvert under the crown of the road (P-1) in km 0+613.80. Reconstruction and/or protection will also be carried out on land weapon networks that interfere with the construction intention, including low- and medium-pressure gas networks, water supply networks, low-voltage ground power cable lines, telecommunications cable sewerage, as well as medium-voltage overhead power line and aeration telecommunications line. 3. The subject matter of the contract includes: 1) dehumusisation of the road lane, 2) removal of greenery, 3) demolition of some construction works - road surface, culverts, 4) protection/reconstruction of the land development network in a manner consistent with the land development project - water supply networks, gas networks, telecommunications ducts and overhead networks, ground and overhead electricity networks, 5) execution of earthworks, i.e. excavations and road embankments to shape the body of the planned road in the field with the preparation of a channel for the planned road surfaces, sidewalks, exits, 6) construction of road ditches with reinforcement of concrete prefabrications, including sealed ditches, covered ditches 7) construction of the P-1 culvert along with strengthening of slopes and the bottom of the watercourse at inlets/outlets, 8) strengthening of the riverbed without the name with mesh and stone baskets in places where the road body is approached, 9) construction of rainwater sewer sections with equipment and outlets, 10) construction of deep and triangular channel wastewater, 11) construction of lower layers of pavement structures - substrate stabilized with cement / adhesive, 12) construction of upper layers of pavement: bituminous on the roadway, concrete (cube) on the pavement 13) construction of ordinary exits to land properties adjacent to the planned road lane, 14) finishing and cleaning works, including leveling the terrain, 4. The contractor is obliged to develop and approve a project for the temporary organization of traffic for the duration of the works taking into account, among others, the complete closure of the road and the appointment of detours. According to the provisions of the ZRID decision, the cost of archaeological supervision during earthworks should be taken into account when valuing the value of the works. 5. The detailed scope of work and the manner of performance shall be determined in order of priority by: the bill of quantities constituting Annex 4 to the tender specifications, the design documentation constituting Annex 2 to the tender specifications, the technical specifications for the execution and acceptance of the works constituting Annex 3 and the other requirements as to the subject-matter of the contract contained in the tender specifications. 6. The contractor is obliged to carry out the works in such a way as to provide residents with access to the property. 7. The subject of the contract should be performed in accordance with applicable regulations, including health and safety regulations, PN transposing standards
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (79 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to EUROVIA Polska S.A.n = 79
- The median procedure drew just one bid (14 procedures with a bid count); 64% ended with a single bidder. Sector: median 5 bids.n = 14
- 51% of this buyer's awards went to companies that had already won here before (218 awards since 2015, spread over 100 companies). 49% went to new names.n = 218 awards since 2015
- Across 5 procedures with structured selection criteria, this buyer most often required: References: supplies (5 of 5), Minimum number of managers (5 of 5).n = 5
- Not one of the 218 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 218
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Usługi Budowlano-Drogowe Robert Darłak | 17 | 2021–2026 |
| TRANSHEN Paweł Sołdan | 15 | 2021–2026 |
| Usługi- Brukarsko- Budowlano- Handlowe Jan Wrona | 11 | 2022–2025 |
| Usługi Transportowe Jan Cabaj | 10 | 2021–2026 |
| F.U.H. GRZEGORZ OZGA | 9 | 2021–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now