How to bid in this country: portals, deadlines, thresholds →
Modernisation and adaptation of public buildings – clusters V and VI at John Paul II Avenue 1-2 in Toruń’.
Modernizacja wraz z adaptacją budynków użyteczności publicznej – zespołu grodzy V i VI przy Alei Św. Jana Pawła II 1-2 w Toruniu”. — original title
Your path to submission
- Deadline: 13 November at 13:00 — 12 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1.1. The subject of the contract includes the performance of the task entitled: ‘Modernisation and adaptation of public buildings - clusters V and VI at St. Peter’s Avenue John Paul II 1-2 in Toruń’. 1.2. The subject matter of the contract covers in particular the following scope of work: Grodza V East: 1) earthmoving and demolition works such as: photo of the fertile layer of 30 cm, excavation of external walls to a depth of 150 cm, forging cavities, demolition of floors, removal of debris, filling the cavities of the building, filling the space behind the walls of the building, 2) conservation works such as: Mushrooming of walls, demolition of brick walls, desalination of walls, reinforcement of walls, replenishment of Gothic brick walls, sewing of walls with steel anchors, hydrophobization of substrates, 3) general construction works such as: fabrication of lightweight aggregate…
Show full description
… sleepers, fabrication of concrete sleepers, fabrication of floor tile floors, replenishment of brick walls, embedding frames with windows in window openings, installation of internal and external doors, installation of toilet system walls, fabrication of insulation from heat-sealing panels, fabrication of identification inscriptions on the façade, 4) fabrication of electrical installations and low-current installations, fabrication of electrical and low-current connections, 5) fabrication of sanitary installations, ventilation and heating systems, fabrication of water connections and sewage connections, 6) greenery works such as: fertile soil, lawn construction, Grodza VI west: 1) earthmoving and demolition works such as: photo of the fertile layer of 30 cm, excavation of external walls to a depth of 150 cm, forging cavities, demolition of floors, removal of debris, filling the cavities of the building, filling the space behind the walls of the building, 2) conservation works such as: Mushrooming of walls, demolition of brick walls, desalination of walls, reinforcement of walls, replenishment of Gothic brick walls, sewing the wall with steel anchors, hydrophobization of substrates, restoration of doors from the side of the Valley of Dreams, 3) general construction works such as: fabrication of lightweight aggregate sleepers, fabrication of concrete sleepers, fabrication of floor tile floors, replenishment of brick walls, embedding frames with windows in window openings, installation of internal and external doors, installation of toilet system walls, fabrication of insulation from heat-sealing panels, fabrication of identification inscriptions on the façade, 4) fabrication of electrical installations and low-current installations, fabrication of electrical and low-current connections, 5) fabrication of sanitary installations, ventilation and heating systems, fabrication of water connections and sewage connections, 6) greenery works such as: laying fertile soil, making lawns. 1.3. The Contractor will perform the subject of the contract within the scope and in the manner specified in the design documentation and technical specifications for the execution and acceptance of construction works [studies made by Piotr Bielecki, conducting business activity under the name: ‘X-BUD Piotr Bielecki’); The ‘component parts of the design documentation and technical specifications for the execution and acceptance of construction works’ are listed in Annex 1 to the model contract, taking into account the contracting authority’s explanations to the tender specifications (answered to the contractors’ questions at the stage of the procedure, hereinafter: ‘explanations to the tender specifications’)] and in accordance with the applicable laws, standards, construction and horticultural art, on the basis of an inspection of the construction site and in accordance with the administrative decisions held by the contracting authority. The contractor will carry out works taking into account the implementation and application of treatments aimed at optimal protection of trees and shrubs on the construction site, in accordance with the guidelines contained in separate provisions of the model contract. 1.4. The contractor will perform the subject matter of the contract taking into account the DNSH (‘do no significant harm’) principle required by Regulation (EU) 2021/241 of the European Parliament and of the Council of 12 February 2021 establishing a Recovery Instrument.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (131 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to WIELKOPOLSKIE PRZEDSIĘBIORSTWO INŻYNIERII HYDROTECHNICZNEJ – DRENBUD Sp. z o.o.n = 131
- The median procedure drew 3 bids (164 procedures with a bid count); 24% ended with a single bidder. Sector: median 5 bids.n = 164
- 36% of this buyer's awards went to companies that had already won here before (627 awards since 2015, spread over 291 companies). 64% went to new names.n = 627 awards since 2015
- The award came in at a median 72% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 5
- 6% of awards went to companies from abroad (627 awards with a known winner country). Sector average: 0%.n = 627
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Rubus Verde Dariusz Malinowski | 20 | 2024–2026 |
| Zakład Usług Ślusarsko Spawalniczych i Transportowych MirosławSzok | 18 | 2021–2026 |
| Dariusz malinowski RUBUS VERDE | 14 | 2022–2026 |
| Bau-Tech Sp. z o.o. | 14 | 2021–2026 |
| Przedsiębiorstwo Handlowo Usługowo Produkcyjne Dorota Dembek | 11 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.