Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Green mobility – low-emission transport in the G7 area – construction of a bicycle path along district road No 1252F on the section from Świecka to the border of the municipality of Słubice.

Zielona mobilność – niskoemisyjny transport na obszarze G7 - budowa ścieżki rowerowej w ciągu drogi powiatowej nr 1252F na odcinku od Świecka do granicy gminy Słubice. — original title

PLPoland · SłubiceBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 10 November at 11:00 — 9 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract is the construction of a bicycle path along the district road No 1252F on the section from Świecka to the border of the municipality of Słubice (Słubice-municipality, Słubice district, Lubuskie province). 2. As part of the planned project, it is planned to build a bicycle path located in Lubuskie Province, Słubice County, Słubice Commune, from Świecko to the border of Słubice Commune on plots No 37/3, 804, - District No 0010 Świecko, Słubice Commune, 98, 140/1, - District No 0011 Rybocice, Słubice Commune, 1, 2/1, 113, 452, - District No 0012 Kunice, Słubice Commune from km 0+000 to km 9+116.50. 4 3. The scope of development of the road industry includes: 3.1.Preparatory and demolition works (including geodetic demarcation of buildings in the field, demolition of existing road surfaces, descents, removal of humus layer, etc.). 3.2. Earthworks related to the…

Show full description

… construction of embankments and the construction of a bicycle path and descents. 3.3. Cutting down trees and shrubs from the road lane that interfere with the investment. 3.4. Execution of the construction of a bicycle path and a walking-bicycle route, execution of ground reinforcement with ground cement, execution of a base layer of broken aggregate, execution of a bituminous bonding and abrasive layer, drizzling layers with asphalt emulsion. 3.5. Reconstruction of ordinary descents (including ground descents) (including, among others, engraving, profiling and compacting the substrate for structural layers, making ground reinforcement with ground cement, making a layer of substructure from broken aggregate, making a pavement from concrete paving stones. 3.6. Reinforcement of the embankment slope with L-type retaining elements. 3.7. Installation of energy-intensive rope barriers along the design of the bicycle path. 3.8. Finishing and cleaning work. 4. The detailed scope of the works is defined by the design documentation, the bill of quantities and the technical specifications, which are annexes to the ToR. 5. The contracting authority for the performance of the contract has the certificate AB.6743.276.2026.ADom of 19.08.2026 issued by the Starost of Słubice on the possibility of starting construction works. 6. The price is an estimate price and the tender must be accompanied by quotation estimates drawn up on the basis of the enclosed bills of quantities. Lack of attached cost estimates will result in rejection of the offer. The Contractor is obliged to indicate in the quotation or on the tender form the man-hour rate (R-g) expressed in PLN. The specified rate will be the basis for settlement of additional, replacement or other works provided for in the contract. Failure to indicate the hourly rate will result in the rejection of the tender as inconsistent with the terms of the contract. 7. The order is not divided into lots. It is a homogeneous contract with a contract value below the EU thresholds. Division of the contract would cause excessive technical and organisational difficulties, related to the correction and supervision of the performance of the activities of the various Contractors performing the contract and increased costs of performance of the contract. In addition, the division of a contract and an attempt to award a contract in lots may risk irregular performance of the contract or even prevent its performance if it is not possible to award a contract for one of its lots. 8. If the Ordering Party, as part of this documentation, in particular in the description of the subject of the contract and the terms and conditions, has indicated trademarks, patents, origin, source or specific process that characterize products or services provided by a specific Contractor, the Ordering Party shall allow equivalent products or services, not inferior to those indicated. The obligation to demonstrate that the products or services offered meet the above requirements lies with the Contractor. The above requirements also apply to standards, approvals, if they are referred to

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published23 Oct 2026

Type of service

45 · Construction work77 · Agricultural services
CPV 45233162-2 · 45100000-8 · 45233200-1 · 77211400-6

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (71 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to FLUX Sp. z o.o.n = 71
  • The median procedure drew just one bid (24 procedures with a bid count); 75% ended with a single bidder. Sector: median 5 bids.n = 24
  • 38% of this buyer's awards went to companies that had already won here before (211 awards since 2017, spread over 116 companies). 62% went to new names.n = 211 awards since 2017
  • 1% of awards went to companies from abroad (211 awards with a known winner country). Sector average: 0%.n = 211

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Przedsiębiorstwo Usług Komunalnych Sp. z o.o.192021–2026
Eurokop Invest Sp. z o.o.112022–2026
Słubicki Ośrodek Sportu i Rekreacji Spółka z ograniczoną62022–2026
Poczta Polska S.A.62022–2025
Agencja Ochrony KASTOR Karpezo i Walczak Sp. Jawna52021–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

11
2021
28
2022
24
2023
26
2024
13
2025
22
2026
124 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Tuesday 10 November at 11:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 18 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now