How to bid in this country: portals, deadlines, thresholds →
Modernisation of the access road to agricultural land in Trzebiatkowa.
Modernizacja drogi dojazdowej do gruntów rolnych w Trzebiatkowej. — original title
Your path to submission
- Deadline: 9 November at 10:00 — 8 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the modernization of the access road to agricultural land in Trzebiatkowa. The scope includes the reconstruction of the municipal road in Trzebiatkowa into an asphalt pavement on a section of approx. 500 mb. The detailed scope for works is described in the construction project (annex to the tender specifications No 4), the technical specifications for the execution and acceptance of construction works (annex to the tender specifications No 5) and the bill of quantities (annex to the tender specifications No 6), with the proviso that the contracting authority accepts solutions equivalent to those described in the above-mentioned design documentation. The construction project covers a larger scope, while this contract covers the execution of only 500 mb counting from the design route KM 0+500 to the end of the planned route. Section KM 0+000 – KM 0+500 has…
Show full description
… already been completed. The Contractor shall be obliged to designate the main points by the authorised surveyor and shall be responsible for protecting the designated measuring points until the final acceptance of the works, if any. Damaged or destroyed geodetic signs will be restored and fixed by the Contractor at his own expense, if applicable. Before commencing works in built-up areas, the Contractor shall notify the owners of the property, buildings, including adjacent buildings (if applicable). Before commencing the works, the Contractor shall also notify the institutions concerned and the owners of the underground armaments of the commencement of construction (if any). When carrying out earthworks in the very close vicinity of buildings, special care should be taken and it is absolutely necessary to comply with the provisions of the construction law. The Contractor undertakes to perform the subject of the contract in accordance with the documentation, rules of technical knowledge and construction art, applicable regulations and Polish standards, under the conditions specified in the contract and the Terms of Reference. Devices and materials adopted in the documentation and technical specifications, work measurements, guarantee the achievement of the desired effect. Where references to standards, European technical assessments, approvals, technical specifications and technical reference systems are used in the documentation describing the subject-matter of the contract, the Contracting Authority shall accept solutions equivalent to those described. When analysing the design documentation, the Contractor should assume that each reference used in the design documentation is accompanied by the word ‘or equivalent . Where trade marks, patents or the origin of products/source/specific process that could characterise products or services provided by a particular economic operator are used in the documentation describing the subject-matter of the contract, this means that they are given for example and specify only the minimum expected quality parameters and the required standard. The contractor may use equivalent materials or equipment, but with similar or better technical and quality parameters, the use of which will not in any way adversely affect the proper functioning of the solutions adopted in the design documentation. The contractor who uses equipment or equivalent materials will be obliged to demonstrate during the performance of the contract that the equipment and materials used by him meet the requirements specified by the Ordering Party. Pursuant to Article 101(1) CTMR, 4 of the Public Procurement Law Act, the Contractor using equivalent materials undertakes to use materials with parameters not worse than those specified in the documentation. If the contracting authority accepts solutions equivalent to those described in the documentation, but does not specify the minimum parameters that would confirm this equivalence, the contractor is obliged to offer a product with similar properties, functionally suitable for the required use. The contracting authority may not reject a tender on the sole ground that the works or supplies offered do not comply with the standards, technical assessments, technical specifications and technical reference systems to which the description of the subject-matter of the contract relates, provided that the economic operator proves in the tender that the solutions proposed are equivalently effective.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (57 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Usługi Ogólnobudowlane Zdzisław Bronk.n = 57
- 33% of this buyer's awards went to companies that had already won here before (117 awards since 2020, spread over 77 companies). 67% went to new names.n = 117 awards since 2020
- Not one of the 117 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 117
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Krzysztof Durawa | 6 | 2023–2025 |
| „LEMAR” Leszek Bigus | 6 | 2022–2024 |
| Przedsiębiorstwo Usług Budowlano-Drogowych "JASZUL" Andrzej Jaszul | 6 | 2023–2026 |
| Usługi Transportowe i Ziemne Henryk Reclaf | 4 | 2025 |
| Przedsiębiorstwo Ecozet Mirosław Zblewski | 4 | 2023–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now