How to bid in this country: portals, deadlines, thresholds →
‘Supply and installation of a container water treatment plant with the necessary accompanying infrastructure on the site of plot 110/4 in Drawno in the formula design and build’
„Dostawa i montaż kontenerowej Stacji Uzdatniania Wody wraz z niezbędną infrastrukturą towarzyszącą na terenie działki 110/4 w Drawnie w formule zaprojektuj i wybuduj” — original title
Your path to submission
- Deadline: 9 November at 11:00 — 8 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the performance of the task entitled: ‘Supply and installation of a container water treatment plant with the necessary accompanying infrastructure on the site of plot 110/4 in Drawno in the formula design and build’ ,, including: - execution of complete design documentation including container construction of SUW in Drawno at ul. Kwiatowa 3, together with the necessary external installations covering the area of plot 110/4, the Drawno area; - obtaining the required administrative arrangements, opinions and decisions; - construction of foundations for the station and equipment; - supply of complete container water treatment plant installation; - construction of technological connections. 2. The subject of the contract will be implemented in two phases: 1) STAGE I – the construction and technological phase – the deadline for implementation is 20 December…
Show full description
… 2026. As part of this stage, the contractor is obliged to carry out works on the basis of a temporary notification of a construction work (Article 29(1)(7) of the Construction Law Act), which allows for: a) effective notification of the construction of a temporary container water treatment plant (operating period up to 180 days) together with the necessary accompanying infrastructure; b) complete design documentation covering the container construction of the Drawno SUW together with the necessary external installations covering the area of plot 110/4, the Drawno area, subject to point a; c) performing geological surveys (conditions for the foundation of the object); d) execution of earthworks, underground connection infrastructure (water-can and electric approaches to the container) and reinforced concrete foundation slab; e) prefabrication, delivery and physical assembly (putting ) complete SUW technology container on the prepared plate; f) construction of internal water supply, sewerage, energy and lighting systems; g) implementation of land development necessary for the functioning of the facility. The project documentation should meet the conditions provided for by the law in force on the date of handing it over to the Ordering Party, the guidelines contained in thematic specific regulations, Polish Standards, principles of technical knowledge and assumptions contained in the PFU. Design documentation should be made in 4 copies in paper version and in 1 electronic version (CD) and include: the construction and execution project, the bill of quantities, the specifications for the technical execution and acceptance of the works, information on safety and health protection and the Contractor's statement that the documentation is made in accordance with the applicable standards. The implementation of STAGE I forms the basis for the financial settlement in 2026, which amounts to 98% of the contract value. The installed equipment must be brand new, free from physical and legal defects. 2) Stage II – the phase of sanctioning the permanent state – the deadline for implementation is 30 June 2027. The Contractor is obliged to perform complete documentation enabling the Contracting Authority to obtain a building permit, i.e.: mapping for design purposes; b) obtaining, on behalf of the Contracting Authority, a final decision on the construction conditions for a permanent water treatment plant, a decision on the environmental conditions for consent to the implementation of the project and other administrative acts required by law in order to complete the documentation for obtaining a building permit; c) execution of as-built documentation with legibly applied all changes introduced during construction along with geodetic inventory of completed networks, installations and facilities; draw up start-up, operation and maintenance instructions and health and safety instructions for use in normal use and emergency situations; e) provide author's supervision until the end of the warranty period; f) obtain a final decision on the building permit for a permanent SUW facility (before the expiry of 180 days from the date of provisional notification from STAGE I. The Contractor shall be responsible for ensuring that the technical parameters of the SUW
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (18 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to Rafał Włodarczyk Usługi Remontowo-Budowlane RAJ.n = 18
- 35% of this buyer's awards went to companies that had already won here before (50 awards since 2019, spread over 30 companies). 65% went to new names.n = 50 awards since 2019
- Not one of the 50 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 50
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Prywatna Komunikacja Lokalna "Jacek"s.c. mgr Teresa Majchrzak, Jacek Majchrzak | 4 | 2021–2022 |
| ENERGOBUD-GDAŃSK SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 4 | 2022–2024 |
| DREN Sp. z o.o. | 3 | 2022–2026 |
| PKL JACEK SPÓŁKA Z.O.O. | 3 | 2024–2026 |
| ForIP Sp. z o.o. | 3 | 2025–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now