Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Execution of complete multi-discipline design and costing documentation for the task entitled ‘Expansion of the Municipal Market and construction of an underground car park with the function of hiding civilians’

Wykonanie kompletnej wielobranżowej dokumentacji projektowo-kosztorysowej dla zadania pn. „Rozbudowa Targowiska Miejskiego wraz z budową parkingu podziemnego z funkcją ukrycia ludności cywilnej — original title

PLPoland · PruszkówBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 4 November at 09:00 — 3 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1) Execution of complete multi-discipline design and costing documentation for the task entitled: ‘Expansion of the Municipal Market and construction of an underground car park with the function of hiding civilians at ul. Komorowska’, necessary for the City of Pruszków to award a contract for the execution of construction works for two separate investment projects carried out successively on plots 8/4 and 227/5 from area 22, i.e.: a) the construction of an administrative and commercial building with the necessary land development and technical infrastructure – covered by a separate building permit decision, intended for implementation in Stage A; b) construction of an underground garage with the function of a protective structure – concealment of category U-1, together with associated facilities, development of the market area, demolition, reconstruction or liquidation of the conflicting…

Show full description

… infrastructure and execution of all necessary connections, installations and equipment of technical infrastructure – covered by a separate building permit decision, intended for implementation in Stage B, after the construction of an administrative and commercial building. 2) Documentation concerning the intention referred to in paragraph 1.3/ point. Point 1(b) is to take into account the implementation of the underground garage and its material scope in three stages (Phase BI-BIII), this stage must be clearly reflected in the design solutions, technical description, bills of quantities, investor's estimates, summary cost statements, BIOZ plan and other studies constituting the subject of the contract, enabling the independent functioning of these stages, especially in terms of their use in accordance with the applicable regulations. The documentation shall include, in particular, design and costing studies for the following material scope:

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published20 Oct 2026

Type of service

71 · Architecture & engineering
CPV 71000000-8 · 71200000-0 · 71220000-6 · 71221000-3 · 71247000-1 · 71240000-2 · 71320000-7 · 71242000-6

Clement What the numbers say about this buyer

  • 6% of this buyer's awards went to companies that had already won here before (32 awards since 2026, spread over 30 companies). That is well below the sector norm (34%) — this buyer switches suppliers more often than others.n = 32 awards since 2026
  • Not one of the 32 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 32

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Dombruk Tomasz Bończak Sp. J.22026
F.H.U. Car-Bud Konrad Karpiuk22026
Krystyna Makowiecka Flormak12026
LIGHT-TECH s.c Mirosław Maksymiuk, Jarosław Jaworski12026
WOD-KAN-BRUK Sp. z o.o.12026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

Contracting authority contact

·
Deadline — Wednesday 4 November at 09:00

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 4,806 completed awards — not a statement about this procedure.)

This procedure allows 15 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.

Foreign bidders

In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,650 recorded awards) — mostly from Germany, France, Switzerland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now