How to bid in this country: portals, deadlines, thresholds →
Construction of ul. A. Fredry in Gdynia with technical infrastructure
Budowa ul. A. Fredry w Gdyni wraz z infrastrukturą techniczną — original title
Your path to submission
- Deadline: 10 November at 10:00 — 9 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
3.1. The subject of the contract is the execution of construction works: ‘Construction of ul. A. Fredry in Gdynia with technical infrastructure’. 3.3. The material scope of the subject of the contract includes: 3.3.1. execution of construction works in accordance with 1) design documentation (Annex 1.1), 2) technical specifications for the execution and acceptance of works (Annex 1.2), 3) instructions for the execution of construction works (Annex 1.3), 4) guidelines developed by the City Gardener Department (Annex 1.4), and taking into account the provisions of point 3.6 of the ToR; 3.3.2. obtaining, on behalf of the contracting authority, effective notice of completion of works or obtaining an occupancy permit from the competent construction supervision authority, as appropriate, and submitting to the contracting authority a document confirming the effectiveness of the notice or…
Show full description
… decision on the occupancy permit; The Contractor shall determine for himself what parts of the subject-matter of the contract and within what time limit such authorisation or notification shall be required. The Contracting Authority shall grant the Contractor the relevant powers of attorney in this regard. 3.4. The subject of the contract for the execution of construction works includes: 3.4.1. reconstruction of the road system, including: 1) preparatory and demolition works, 2) construction of a substructure, 3) construction of a surface, 4) construction of street elements; 3.4.2. reconstruction of rainwater sewerage, 3.4.3. reconstruction of water supply network, 3.4.4. removal of cable line collisions, 3.4.5. reconstruction of street lighting, 3.4.6. execution of small architecture, 3.4.7. greenery, including: 1) securing existing greenery, 2) grubbing up trees and shrubs, 3) making and restoring lawns; 3.4.8. Temporary traffic organization, 3.4.9. Permanent organization of traffic. 3.5. A detailed description of the subject of the contract with regard to the execution of construction works is attached as Annex 1 to the ToR, including: 3.5.1. design documentation – Annex 1.1; 3.5.2. technical specifications for the execution and acceptance of works – Annex 1.2; 3.5.3. instructions for the execution of construction works – Annex 1.3; 3.5.4. guidelines developed by the City Gardener Department - Annex 1.4; as well as the Ordering Party's instructions contained in point 3.6 of the ToR. 3.6. In addition, the subject of the contract includes: 3.6.1. drainage and strengthening of excavations for the duration of works according to the Contractor's solutions and to the extent necessary for the implementation of the subject of the contract. Method of strengthening and drainage of excavations The Contractor is obliged to prepare on his own and before the commencement of works agree with the Investor's Supervision, 3.6.2. protection and restoration of detailed horizontal and vertical geodetic warp, 3.6.3. preparation of the design of temporary traffic organization, obtaining its approval and obtaining approval and consent to occupy the road lane, 3.6.4. preparation of the design of permanent traffic organization and its approval by the Department of Traffic Organization of the Investment Department, we attach an outdated development for use, 3.6.5. execution of temporary traffic organization for the duration of works, its maintenance for the period resulting from the schedule of works and invoicing and dismantling after this period (materials from dismantling are the property of the Contractor), 3.6.6. execution of any temporary / assembly roads for the duration of works to the extent necessary to get to the place of the entire scope of works covered by the contract, their maintenance for the period resulting from the schedule of works and dismantling after this period (materials from dismantling are the property of the Contractor). 3.6.7. physical dismantling of the existing armament of the area to be excluded, including drawing up on a copy of the master map records of the removed objects, 3.6.8. drawing on a copy of the master map records of the removed objects, 3.6.9. height regulation of the existing armament, 3.6.10. reconstruction of the surface existing after excavations for construction, reconstruction of the network, switching of connections and dismantling of the network
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (57 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to „WPRD GRAVEL” Sp. z o.o.n = 57
- 24% of this buyer's awards went to companies that had already won here before (573 awards since 2015, spread over 297 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 573 awards since 2015
- The median procedure drew 3 bids (168 procedures with a bid count); 27% ended with a single bidder. Sector: median 5 bids.n = 168
- 8% of awards went to companies from abroad (573 awards with a known winner country). Sector average: 0%.n = 573
- 100% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 84%.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Eligibility analysis from the tender documents
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| UNIFUND SP. Z O.O. | 11 | 2021–2023 |
| Platan Ewa Ostrzyniewska - Patyna | 7 | 2023–2026 |
| Netcore Labs sp. z o.o. | 7 | 2021–2026 |
| Wytwórnia Tablic ZNAK Sp.z o.o. | 5 | 2022–2025 |
| Drukarnia Bałtycka Sp. z o.o. | 5 | 2022–2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 9 or more bids came in. Many compete here — price and references decide. (Based on 6 completed awards — not a statement about this procedure.)
This procedure allows 22 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now