Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Construction and modernisation of infrastructure improving the safety of vulnerable road users on the voivodeship road network administered by the ŚZDW in Kielce, divided into two parts

Budowa i modernizacja infrastruktury poprawiającej bezpieczeństwo niechronionych uczestników ruchu drogowego na sieci dróg wojew. administrowanych przez ŚZDW w Kielcach w podziale na 2 zad. częściowe — original title

PLPoland · KielceBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 10:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. Task 1. RDW Zgórsko – OD Pińczów, OD Łopuszno The scope of the contract includes in particular: 1) Execution of the necessary design documentation. Design documentation should be internally consistent and correlated in all industries, contain optimal functional, functional, construction, material and cost solutions, which are subject to agreement with the Ordering Party. The composition of the project documentation and the method of its development is described in detail in the Functional-Use Program (PFU). 2) Execution of construction works together with the necessary accompanying infrastructure based on the design documentation performed by the Contractor of the works together with services that are not construction works. The detailed scope of works is presented in the PFU. 3) Performing author's supervision over the developed design documentation at the stage of construction…

Show full description

… works. The scope of the contract includes the execution of all necessary works for the proper implementation of projects of permanent traffic organization, in accordance with applicable law and their each change on the date of submission of the project documentation. It is necessary to carry out all necessary design studies (even those resulting from changes in legal regulations), obtain on behalf of and for the benefit of the Ordering Party the necessary opinions and conditions, all arrangements, permits, permits, decisions and consents necessary for the performance of the scope of the contract in accordance with applicable regulations and perform construction works enabling the proper functioning of the introduced traffic organization. The Contractor is obliged to seek and propose solutions, including technical and technological ones, which reduce the duration of construction and assembly works and reduce construction, maintenance and use costs. The Contractor of the documentation is obliged to comply with the design solutions in accordance with applicable laws and regulations. In accordance with Art. 1 of the Public Procurement Act, project documentation should take into account the accessibility of the designed solutions for persons with disabilities. The detailed scope of works is presented in the Functional and Utility Programme (PFU). 2. Task 2. RDW Staszów – OD Staszów, OD Nowa Słupia, OD Tempoczów, OD Ćmielów The scope of the contract includes in particular: 1) Execution of the necessary design documentation. Design documentation should be internally consistent and correlated in all industries, contain optimal functional, functional, construction, material and cost solutions, which are subject to agreement with the Ordering Party. The composition of the project documentation and the method of its development is described in detail in the Functional-Use Program (PFU). 2) Execution of construction works together with the necessary accompanying infrastructure based on the design documentation performed by the Contractor of the works together with services that are not construction works. The detailed scope of works is presented in the PFU. 3) Performing author's supervision over the developed design documentation at the stage of construction works. The scope of the contract includes the execution of all necessary works for the proper implementation of projects of permanent traffic organization, in accordance with applicable law and their each change on the date of submission of the project documentation. It is necessary to carry out all necessary design studies (even those resulting from changes in legal regulations), obtain on behalf of and for the benefit of the Ordering Party the necessary opinions and conditions, all arrangements, permits, permits, decisions and consents necessary for the performance of the scope of the contract in accordance with applicable regulations and perform construction works enabling the proper functioning of the introduced traffic organization. The Contractor is obliged to seek and propose solutions, including technical and technological ones, which reduce the duration of construction and assembly works and reduce construction, maintenance and use costs. The Contractor of the documentation is obliged to comply with the design solutions

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published16 Oct 2026
2 lots

Type of service

71 · Architecture & engineering45 · Construction work
CPV 71320000-7 · 45233120-6 · 45220000-5 · 71322000-1 · 71322500-6

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (56 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Grupa Zadaniowa Outsourcing Sp. z o. o.n = 56
  • 58% of this buyer's awards went to companies that had already won here before (462 awards since 2021, spread over 195 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 462 awards since 2021
  • Not one of the 462 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 462

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Przedsiębiorstwo Drogowe Sp. z o.o. DYLMEX-INWESTYCJE Sp.k.262021–2026
Przedsiębiorstwo Robót Inżynieryjnych „Fart” Sp. z o.o. ,232021–2026
"Rob-Trans" PHU Piotr Robak102022–2026
F.H.U. „KOWEX” Piotr Cieśla92022–2026
Zakład Robót Drogowych DUKT Sp. z o.o.92021–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

6
2021
14
2022
8
2023
4
2024
12
2025
6
2026
50 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 4,806 completed awards — not a statement about this procedure.)

This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now