How to bid in this country: portals, deadlines, thresholds →
Extension of municipal road No 031410C – ul. Wincentego Witosa in Świecie, including the construction of rainwater and sanitary sewerage systems
Rozbudowa drogi gminnej nr 031410C – ul. Wincentego Witosa w Świeciu wraz z budową kanalizacji deszczowej i kanalizacji sanitarnej — original title
Your path to submission
- Deadline: 6 November at 09:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the extension of the municipal road No. 031410C - ul. Wincentego Witos in Świecie on the section from ul. Water to ul. the Home Army. 2. The road in question is a public road, category: municipal road, class: L. 3. The project will consist, among others, of: • Execution of the overlay on the roadway; • construction of a new road construction after sanitary works; • construction of a one-sided road for pedestrians and bicycles; • redevelopment of the pedestrian road; • reconstruction and construction of conventions; • Setting of street furniture elements; • Execution of horizontal and vertical markings; • construction of a rainwater sewer in ul. Vitosa; • construction of sanitary sewerage. The length of the section covered by the extension is 321.00 m. 4. As part of the performance of the task, the Contractor is also obliged to: • geodetic services during…
Show full description
… the performed works, including geodetic demarcation and as-built inventory; • implementing the project of temporary traffic organisation, introducing with the maintenance of the temporary signage of the construction in accordance with the project of temporary traffic organisation carried out and approved by the Contractor; • verifying discrepancies in the course of underground infrastructure between the project documentation and the currently available cadastral resources, as well as performing test and control excavations to identify possible differences between the infrastructure included in the project documentation and cadastral resources and its actual condition in the field; • organising and coordinating the works in such a way as to enable the representatives of Zakład Wodociągów i Kanalizacji (ZWiK) to carry out the reconstruction of the water supply system within a given investment (design scope, schedule of works and other details currently available at the headquarters of ZWiK ,, and in the near future on the ZWiK purchasing platform). The contractor will ensure access to the site, in particular by preparing the site properly, securing it and removing any obstacles preventing the works from being carried out by ZWiK. The Contractor is obliged to cooperate with representatives of ZWiK in the organization and implementation of the above works. The above activities should be included in the schedule of works. For enabling ZWiK to perform the works referred to above, the Contractor shall not be entitled to any claims against the Ordering Party, in particular regarding the extension of the deadline for performance of the contract or additional remuneration, if the need to perform them was provided for in the documentation of the procedure; • update, on behalf of the Investor, any arrangements (which have expired) with institutions, public administration bodies and geography of underground and above-ground networks. The above cannot be the reason for claims related to the postponement of the planned date and the execution of additional construction works. The Contracting Authority shall grant the Contractor the relevant powers of attorney in this regard; • obtain a decision on the occupancy permit or make an effective notification of the completion of construction works to the competent construction supervision authority, in accordance with the provisions of the Construction Law Act of 7 July 1994, and then submit to the Contracting Authority, as appropriate, a final decision on the occupancy permit or a document confirming that the competent authority has not filed an objection within the statutory deadline. The Contracting Authority undertakes to grant the Contractor the appropriate powers of attorney necessary to carry out the above activities or to sign the request prepared by the Contractor. 5. As part of the performance of the task, the Contractor is also obliged to provide technical supervision in the form of: a) Construction manager – having building rights to manage construction works in the specialty of road engineering, in accordance with the provisions of the Construction Law Act; b) Works manager - having building rights to manage construction works in the installation specialty in the field of networks, installations and equipment c
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (86 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to Przedsiębiorstwo Inżynieryjne Hemar Sp. z o.o.n = 86
- The median procedure drew just one bid (21 procedures with a bid count); 52% ended with a single bidder. Sector: median 5 bids.n = 21
- 51% of this buyer's awards went to companies that had already won here before (159 awards since 2015, spread over 73 companies). 49% went to new names.n = 159 awards since 2015
- 1% of awards went to companies from abroad (159 awards with a known winner country). Sector average: 0%.n = 159
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Zakład Drogowo Mostowy Spółka z o.o. | 37 | 2021–2026 |
| Zakład Usług Komunalnych Sp. z o.o. | 15 | 2015–2026 |
| Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o. | 8 | 2021–2025 |
| Przedsiębiorstwo Inżynieryjne Hemar Sp. z o.o. | 6 | 2023–2026 |
| ENEA Oświetlenie Sp. z o.o. | 6 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 22 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now