Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Construction of a skatepark with accompanying infrastructure in Stare Juchy

Budowa skateparku wraz z infrastrukturą towarzyszącą w miejscowości Stare Juchy — original title

PLPoland · Stare JuchyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 3 November at 10:00 — 2 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject-matter of the contract shall include in particular: 1) making a monolithic concrete road plate with prefabricated skateboarding elements installed in it, 2) installation of 2 pcs. of terrain lighting poles equipped with independent solar power supply, 3) installation of a wireless monitoring camera, 4) installation of small architecture, 5) laying new pedestrian surfaces and brick-type concrete pavement bands, 6) zoning of green areas. 2. A detailed description of the subject-matter of the contract is contained in the project documentation and the technical specifications for the execution and acceptance of the works – Annexes 7.1 to 7.16 and 8 to the tender specifications, hereinafter referred to as the tender specifications. The bill of quantities constituting Annex 9 to the ToR is treated only as illustrative material and does not constitute a description of the…

Show full description

… subject-matter of the contract within the meaning of Article 103 of the Public Procurement Law. The building permit decision attached as Annex 7.16 to the ToR remains valid. 3. The design documentation or technical specifications for the execution and acceptance of works may indicate, for certain materials, products, items of equipment or devices, trademarks or origin. The Contracting Authority shall allow the offer of materials, products, items of equipment or devices equivalent to those indicated in the design documentation or technical specifications for the execution and acceptance of works, provided that they guarantee the performance of the subject-matter of the contract in accordance with the decisions obtained, ensure the achievement of parameters at least at the same level as assumed in the design documentation or technical specifications for the execution and acceptance of works and are not inferior in terms of: 1) functional character understood as the identity of functions, 2) technical parameters understood as strength and durability, 3) safety parameters of use. 4. Whenever the contracting authority refers in the tender specifications to standards, European technical assessments, technical specifications and technical reference systems, solutions equivalent to those described shall be accepted and the words ‘or equivalent’ shall apply. 5. All materials and products used during the execution of the subject of the contract must be new and meet the requirements of markings and conformity assessment listed in the Act of 16 April 2004 on construction products (Journal of Laws No. Journal of Laws 2021, item 1213). 6. Equipment and items of equipment supplied by the contractor as part of the performance of the contract must be brand new, free from technical defects, released for free circulation and use, in accordance with the requirements set out in the tender specifications. 7. The Contractor will be obliged to maintain order and care during the performance of the subject of the contract and after its completion, therefore he will have to make every effort to protect against destruction, dirt or damage to fixed, movable elements, all equipment of the Ordering Party in the area of construction works. 8. The Contractor is obliged to perform the contract in accordance with the principles of modern knowledge, applicable regulations, standards and with respect for the principles of health and safety at work. 9. In the event of discrepancies, contradictions or inconsistencies between the provisions of the ToR and the draft provisions of the contract and the content of the other annexes to the ToR, the following order of priority of documents shall apply: 1) ITS and draft provisions of the contract, 2) other annexes to the ITS, including design documentation and technical specifications for the execution and acceptance of works.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published15 Oct 2026

Type of service

45 · Construction work
CPV 45212200-8 · 45112720-8

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (18 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to SORTED Spółka z o.o.n = 18
  • 26% of this buyer's awards went to companies that had already won here before (35 awards since 2021, spread over 26 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 35 awards since 2021
  • Not one of the 35 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 35

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Przedsiębiorstwo Robót Drogowych w Ełku Sp. z o.o.52022–2025
KOMA Ełk Sp. z o.o.32021–2024
DROGBUD Paweł Kochański22025–2026
Przedsiębiorstwo Budownictwa Inżynieryjnego Sp. z o. o.22022–2023
Budimar Radosław Zięcina,22022
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

7
2022
7
2023
8
2024
2
2025
4
2026
28 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Tuesday 3 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 19 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now