How to bid in this country: portals, deadlines, thresholds →
Development of project documentation for the construction of a municipal road from ul. Saperów Tczewskich to ul. Kilińskiego, including road lighting and drainage
Opracowanie dokumentacji projektowej na zadanie Budowa drogi gminnej od ul. Saperów Tczewskich do ul. Kilińskiego wraz z oświetleniem drogowym i odwodnieniem — original title
Your path to submission
- Deadline: 5 November at 10:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The task includes the preparation of project documentation ‘Construction of a municipal road from ul. Saperów Tczewskich to ul. Kiliński with road lighting and dehydration’. 1. The scope of the project documentation in question includes the construction of a municipal road on the section from point A to B (in accordance with the graphic annex – Annex 8 to the tender specifications), i.e. to the intersection of roads on plot No ewid. 1032/71 with road lighting, dehydration and pedestrian track. 2. In the area from points B to D, according to the indications on the graphic annex, the project should include the reconstruction of the road in the field of drainage and road lighting and the design of possible extensions or local extensions of the existing roadway (to be agreed with the Contracting Authority at the stage of the conceptual design). In addition, in the section from points B to C,…
Show full description
… a continuation of the pedestrian path from section A-B should be designed to connect it to the existing pavement at the northern entrance of the city park. The planned road should be connected to the existing road network by intersections and ordinary exits. Pedestrian crossings in the required areas and road markings should also be designed. Due to the limitations in the width and area of the area belonging to the Contracting Authority, the investment described above will require obtaining a decision authorising the implementation of a road investment. Length of the A-B section about 350 m, length of the B-C section about 150 m, length of the C-D section about 390 m, total length about 890 m. For the whole task, one decision should be obtained for the implementation of the road investment. 3. Parameters for designed roads: • Technical class – D • Traffic category – KR1 • Number of lanes – 2 (per segment) A-B) • Na odc. B-C and C-D, possibly a two-way single-lane road 1) Regardless of the solutions presented in the above-mentioned concept, all road elements should be designed in accordance with the applicable regulations. The planned road should be connected to the existing road network by intersections or public exits. 2) The drainage method suggested by the Ordering Party is the drainage of rainwater to the designed rainwater sewer with drainage to the existing ditch or evaporation tank. The documentation should meet the requirements of the applicable legal regulations in this area. 3) The collisions of the planned road with the physical infrastructure equipment shall be resolved by designing the necessary spacers/reconstruction/protection of the infrastructure in consultation with the network managers (if any). 4) The scope also includes obtaining on behalf of the Ordering Party the necessary decisions, contracts and conditions in order to have the right to dispose of the land by the Ordering Party for construction purposes, as well as possible obtaining (if required by separate provisions) an environmental decision, water permit and obtaining the necessary arrangements and conditions for the implementation of the subject of the contract. 4. Range of road lighting: 1) Application to PGE to obtain the conditions for connection to the power grid or increase the power for the existing lighting connection at ul. Saperów Tczewskich 2) Development of design documentation for building and executive permits. 3) The location of the lighting network on the side of the pavement. 4) Lighting Construction Guidelines: a) - led luminaires with reactive power compensation, b) - aluminum poles, c) - astronomical clock control, d) - illuminance according to the norm for municipal roads. 5. Dehydration range: 1) Obtaining a water permit to drain rainwater. 2) Preparation of project documentation for the decision authorising the implementation of the road and executive investment. 6. Pedestrian string: 1) design a pedestrian path in accordance with applicable regulations, 2) width, location and type of surface to be agreed with the Ordering Party at the stage of conceptual design The Designer will be obliged to obtain on behalf of the Ordering Party the final and legal
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (42 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to Biuro Usług Projektowych Marian Daczyński.n = 42
- The median procedure drew 2 bids (13 procedures with a bid count); 15% ended with a single bidder. Sector: median 4 bids.n = 13
- 32% of this buyer's awards went to companies that had already won here before (194 awards since 2021, spread over 124 companies). 68% went to new names.n = 194 awards since 2021
- 1% of awards went to companies from abroad (194 awards with a known winner country). Sector average: 0%.n = 194
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| MAT-BUD Mateusz Litwiński | 9 | 2021–2026 |
| Paweł Lach | 9 | 2021–2023 |
| Nadsański Bank Spółdzielczy | 7 | 2022–2025 |
| Przedsiębiorstwo Drogowe Sp. z o.o. | 6 | 2021–2025 |
| PRZEDSIĘBIORSTWO "MOLTER" SP. Z O.O. | 4 | 2023–2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 4,806 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now