How to bid in this country: portals, deadlines, thresholds →
Design and execution of construction works in connection with the implementation of the task entitled: "The Andre Citroen thematic route over the Huta Józefów lagoon in Głowno".
Zaprojektowanie i wykonanie robót budowlanych w związku z realizacją zadania pn. : "Szlak tematyczny Andre Citroena nad zalewem Huta Józefów w Głownie". — original title
Your path to submission
- Deadline: 2 November at 10:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the design and construction of a thematic route related to the stay in Głowno, in 1900, of the French engineer Andre Citroën and his inspiration with a wooden gear with visor teeth. The contract consists in preparing the design documentation together with obtaining for the benefit of the Municipality of Głowno all the necessary opinions and consents together with the decision on the building permit or effective notification of the execution of construction works for which the decision on the building permit is not required and the execution of construction works on the basis of the draft design documentation and technical specifications for the execution and acceptance of construction works, in the ‘design and build’ formula and carrying out copyright supervision. Scope of construction works – abbreviated information, The appearance of the trail refers…
Show full description
… to the industrial and factory style. The visual element of the project is a gearbox containing canopy gears. The project almost does not interfere with the natural environment - it preserves the existing greenery, assumes the implementation of new plantings, provides for the construction of paths with permeable surface, installation of energy-saving lighting, "enclosure" of trees with useful elements such as benches, seats and a protective grille. The first point of the thematic route is the place where André Citroën made his discovery – a weir piling up on the Mrodze River, owned by the Municipality of Głowno, located at ul. Louis Norblin on plot 18/76 within G-13. In the vicinity of this place, an information board with moving mechanical elements with an inscription in 3 language versions is located: in Polish, French and English, containing the history of André Citroën's fascination with an innovative solution and a replica of gears with canopy-toothed wheels. In the scope of the contract for the performance of the Andre Citroën Trail, in addition to the above, there are, among others: - information and directional signs - industrial park of the explorer, family-friendly and blending into the surrounding nature. The area of the discoverer's park is divided into four zones (from A to D) connected by educational paths: Young explorer zone – a modern physical activity zone for children (containing a climbing pyramid, obstacle courses, trampolines built into the ground, an efficiency panel and an obstacle course – a training ground, a total of 6 play equipment). The central element of the zone is a playful replica of the , car, which can be used for multifunctional, creative fun. Safety zones of equipment with a fall-absorbing substrate made of sand. Sensory education zone - a scientific playground containing devices of scientific education through play. Installation of the following equipment is envisaged: curved mirror, periscope, Newton's cradle, music-sensory panel, belated sound, deaf telephone, sundial, globe and air cannon (a total of 9 scientific education devices). Historical Education Zone – depiction on information boards positioned along the educational path of André Citroën’s further history, upon his return to France. It is planned to set 4 arrays along the path set in places marked in the graphic version of the zoning. Texts in three language versions on the boards. The required content of the texts will be provided by the Investor. Relaxation area - with places to relax, meetings for the whole family. There is a place for social integration, an open-air cinema - a place for outdoor events, hardening with cubes for intimate social meetings, a zone of relaxation and rest in the open air, by the waters of the Huta Józefów lagoon. The relaxation zone is planned to be equipped with 3 pcs, outdoor hammocks, fixed, 2 pcs. double deck chairs and 4 set of deck chairs with a table (the set includes 2 single deck chairs and one table). In addition, in this zone there will be benches, trash cans and bicycle racks, which are the equipment of the entire study area and included in the further description. - Discovery park zones connected to each other design
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (38 awards, most recently August 2026) — the next award is due around December 2026 by that rhythm. The last award went to MIG-BUD Sp. z o.o.n = 38
- 24% of this buyer's awards went to companies that had already won here before (76 awards since 2017, spread over 53 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 76 awards since 2017
- The median procedure drew 2 bids (10 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 10
- 4% of awards went to companies from abroad (76 awards with a known winner country). Sector average: 0%.n = 76
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Usługi Budowlane KAL-BRUK Skkrzatek Zbigniew | 5 | 2022–2025 |
| Usługi Budowlane "KAL-BRUK" Skrzatek Zbigniew | 5 | 2023–2026 |
| Bank Spółdzielczy w Głownie | 4 | 2022–2024 |
| REMONDIS Sp. z o. o. | 4 | 2019–2023 |
| Zakład Ogólnobudowlany MARBUDEX Marek Kierlańczyk | 4 | 2021–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 19 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now