How to bid in this country: portals, deadlines, thresholds →
‘Reconstruction of the power supply system for the RGW switchgear and adaptation of the safety features and associated infrastructure to the projected load at the Hospital "Pro-Medica" in Ełk Sp. z o.o.’
„Przebudowa układu zasilania rozdzielnicy RGW wraz z dostosowaniem zabezpieczeń i infrastruktury towarzyszącej do projektowanego obciążenia w Szpitalu "Pro-Medica" w Ełku Sp. z o.o." — original title
Your path to submission
- Deadline: 3 November at 08:30 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the reconstruction of the power supply system of the RGW switchgear along with the adaptation of security and accompanying infrastructure to the planned load at the Hospital Pro-Medica in Ełk Sp. z o.o. at ul. Lambs 24 in Ełk, on the basis of an executive draft, which is Annex 10 to the ToR. 2. The description of the subject-matter of the contract (OPZ) is attached as Annex 10 to the tender specification – Implementing draft. 3. The bill of quantities, which is merely an ancillary document, is attached as Annex 11 to the ToR.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (6 awards, most recently May 2025) — by that rhythm the next award was due around September 2025. The last award went to Zakład Elektroniki SUWAR Sadowska Spółka Jawna.n = 6
- The median procedure drew just one bid (5 procedures with a bid count); 60% ended with a single bidder. Sector: median 5 bids.n = 5
- 52% of this buyer's awards went to companies that had already won here before (410 awards since 2021, spread over 185 companies). 48% went to new names.n = 410 awards since 2021
- Not one of the 410 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 410
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Zarys International Group Sp. z o.o., | 16 | 2022–2026 |
| Medtronic Poland Sp. z o. o | 13 | 2021–2025 |
| Paul Hartmann Polska Sp. z o. o. | 10 | 2021–2025 |
| Yavo Sp. z o. o. | 9 | 2021–2025 |
| BIALMED Sp. z o.o. | 8 | 2021–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 25 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now