Friedrich & ClementBETA

Development of multi-discipline design documentation consisting in the construction of two multi-family two-cage residential buildings with the necessary technical infrastructure in Woźniki

Opracowanie wielobranżowej dokumentacji projektowej polegającej na budowie dwóch budynków mieszkalnych wielorodzinnych dwuklatkowych wraz z niezbędną infrastrukturą techniczną w miejscowości Woźniki

Poland · Lubliniec · how to bid here →

Your path to submission

  1. Deadline: 15 October at 10:00 — 9 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (14 awards, most recently May 2026) — by that rhythm the next award was due around August 2026. The last award went to AMBIENT STUDIO PROJEKTOWE PIOTR GARA.n = 14
  • 29% of this buyer's awards went to companies that had already won here before (22 awards since 2023, spread over 15 companies). 71% went to new names.n = 22 awards since 2023
  • Not one of the 22 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 22

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Foreign bidders

In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,054 recorded awards) — mostly from Germany, France, Switzerland.

Typical field: median 4 (from 4,644 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the updating of the land development concept and the development of complete design and cost documentation, including all necessary studies, arrangements and documents required for the proper implementation of the investment. The investment is carried out for the needs of SIM Śląsk Północ Sp. z o.o. with its registered office in Lubliniec at ul. Paderewskiego 9, 42-700 Lubliniec, within the boundaries of plot No 8/12, area 0005 Woźniki. The scope of the contract also includes obtaining, on behalf of the Ordering Party, all required administrative decisions, certificates, opinions and arrangements necessary for the preparation and implementation of construction works, in particular enabling obtaining a building permit or effective notification of construction works in accordance with applicable law. 1. Scope of the study 1) development of a comprehensive…

Show full description

… update of the architectural and urban concept covering buildings marked with the attached concept 1A-1B and 2A-2B [2 variants at the stage of project agreement + 5 photorealistic visualization scenes showing the final effect] together with a map for design purposes; 2) preparation of a construction project - architectural and construction project [PAB], land development project [PZT], along with descriptions and annexes to the construction project; 3) development of technical projects [PT] and implementation projects, with descriptions covering all industries, in particular: a) Construction, b) Sanitary, c) Electrical and teletechnical, d) Road in the field of communication and parking spaces, e) Low-current and fire-fighting installations. 4) preparing and obtaining all necessary documents and arrangements, including: geotechnical opinion/geological and engineering opinion, decision to remove trees and shrubs [if required] all arrangements with the Commune [including, among others, agreeing exits to the public road, parking spaces], arrangements with network inspectors, industry agreements, obtaining a final decision Permit to Build [PNB] with a finality clause, 5) performing author's supervision throughout the period of construction works, 6) preparing investor's cost estimates and bills of quantities covering all industries and preparing technical documentation and Technical Specifications for the Execution and Acceptance of Construction Works covering all industries. 2. Functional and design assumptions 1) designed multi-family buildings should include dwellings with a diverse surface structure adapted to the needs of single and multi-person households, preference for M3 dwellings, i.e. living room with kitchen and two bedrooms 2) land development should include parking spaces, accesses, accesses, outdoor lighting, greenery and elements of small architecture, playground, bicycle shed, garbage canopy; 3) common areas should be provided in buildings, including staircases, lifts adapted to carry people with stretchers and furniture (in each cage), general communication, technical and utility rooms, trolley/bicycle, IT rooms; 4) premises should be designed in a standard of finish enabling them to be settled without the need for construction works by the tenant and in particular: f) plasters, floors, painting walls and ceilings, (walls and ceilings finished with plaster plaster - for both apartments and staircases) g) floors finished with panels or porcelain tiles, h) ceramic tiles on the walls in bathrooms and an intercabinet belt in the kitchen (tiles 30x60cm, white matt, over-counter strip with a height of 60cm). Floor tiles in apartments and common areas with a height. 60x60cm, i) skirting boards about 8 cm high. Pedestals made of tiles of the same height as skirting boards, (j) white sanitary installation; in the bathrooms: flush-mounted toilet sets, dominance of shower cabins with linear drains with fittings, k) external and internal doors, premises

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerSIM ŚLĄSK PÓŁNOC SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
TypeServices
Estimated valuenot published — common for below-threshold procedures
Published2 October 2026
CategoryArchitecture & engineering · CPV 71220000-6

Who has won here before

CompanyAwardsPeriod
GOWIN&SIUTA SP.J.32024
Grupa AMB Budownictwo Sp. z o.o.32025
Gramar sp. z o.o.22025
ABC Pracownia Projektowa Bożena Nosiła22024
RISER Sp. z o.o.22023
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20235
20247
20253
20265

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Thursday 15 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Development of multi-discipline design documentation consisting in the construction of two multi-family two-cage residential buildings with the necessary technical infrastructure in Woźniki