How to bid in this country: portals, deadlines, thresholds →
Development of project documentation for the extension of provincial road 580 in Sochaczew from the junction with ul. Młynarska to the junction with ul. Warzywna – procedure No 193/26
Opracowanie dokumentacji projektowej dla rozbudowy drogi wojewódzkiej 580 na terenie m. Sochaczew od skrzyżowania z ul. Młynarską do skrzyżowania z ul. Warzywną – nr postępowania 193/26 — original title
Your path to submission
- Deadline: 3 November at 08:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the development of design documentation for the extension of provincial road 580 in the area of Sochaczew from the junction with ul. Młynarska to the intersection with ul. Vegetable. The documentation should include the following studies: 1.1. Geotechnical and geological documentation 1.2. Construction project (PZT + PAB + PT) 1.3. Demolition project 1.4. Maps containing property division projects 1.5. Annexes to the application for a decision authorising the implementation of road investment 1.6. Annexes to the application for water consent (if necessary) 1.7. Project for the permanent organisation of traffic 1.8. Executive design 1.9. Technical specifications 1.10. Investor cost estimate 2. A detailed description of the subject-matter of the contract can be found in Part IV of the ToR – Technical Specifications. 3. If the developed design documentation…
Show full description
… indicates trademarks, patents or origin, source or specific process that characterizes the product or services provided by a specific contractor, the Designer is obliged to allow equivalent solutions. When reference is made in the design documentation to standards, European technical assessments, approvals, technical specifications and technical reference systems, the Designer accepts solutions equivalent to those described. 4. During the performance of the contract, the Contractor is obliged to have a current civil liability insurance policy in the scope identical to the scope of the service entrusted to be performed and for a guarantee amount not lower than PLN 200 000.00. a) The Contractor is obliged to submit a policy confirming compliance with the above-mentioned requirement within no more than 7 days from the date of conclusion of the contract. b) If the Contractor fails to submit a policy within 3 months from the signing of the contract, the Contracting Authority will be entitled to withdraw from the contract for reasons attributable to the Contractor. c) The Contracting Authority allows a situation in which the Contractor will systematically present during the term of the contract policies confirming the possession of third party liability insurance meeting the above-mentioned parameters instead of one policy for the entire duration of the contract.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (189 awards, most recently October 2026) — the next award is due around November 2026 by that rhythm. The last award went to Drogowiec Jakubecki, Milewski, Sietejko sp.k.n = 189
- 62% of this buyer's awards went to companies that had already won here before (1,622 awards since 2015, spread over 515 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 1,622 awards since 2015
- The median procedure drew 6 bids (333 procedures with a bid count); 5% ended with a single bidder. Sector: median 4 bids.n = 333
- 100% of the bids received came from small and medium-sized enterprises (59 procedures with a bid mix). Sector: 84%.n = 59
- 2% of awards went to companies from abroad (1,622 awards with a known winner country). Sector average: 0%.n = 1,622
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| STRABAG Sp. z o.o. | 73 | 2021–2026 |
| Przedsiębiorstwo Robót Drogowo – Budowlanych S.A. | 56 | 2021–2026 |
| Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o. | 55 | 2021–2025 |
| COLAS Polska Sp. z o.o. | 38 | 2020–2026 |
| BUDROMOST-STARACHOWICE” Sp. z o.o. | 34 | 2021–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually 9 or more bids came in. Many compete here — price and references decide. (Based on 30 completed awards — not a statement about this procedure.)
This procedure allows 32 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
Foreign bidders
In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,650 recorded awards) — mostly from Germany, France, Switzerland.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now